Situation: a large site, nine warehouses and a payment question
The director of a chemical plant is considering a system that locates employees across a site with nine warehouses spread over the area. Technically the case is clear: BLE transmitters mounted in buildings and along plant roads, and trackers worn by people working alone or in higher-risk zones. The open question is financial: should the devices be on a subscription, or bought and recorded as assets?
This text describes a concept for a plant of the type above, not a completed deployment. The figures come from a calculation prepared for a site of similar scale. All amounts are indicative ranges from 2025-2026 deployments, and pricing for a specific plant is always individual.
The director has two options. The first is rental under a subscription: a one-off implementation, a licence fee, and devices paid monthly. The second is sale of the devices with licences under a subscription: the hardware becomes the customer's property, and monthly payments cover software and maintenance. The contract is concluded for an indefinite period with monthly notice, and installation takes 2 to 10 weeks from the order.
What the one-off 147,000 PLN consists of
In the purchase scenario the one-off spend has three hardware items. InnerWeb is the software manufacturer, and the industrial beacon has an industrial design registration, a CE declaration and an ATEX execution for zones 2/22. The remaining equipment, namely trackers and multi-chargers, is purchased and integrated. This keeps hardware and software as separate budget lines, which makes the discussion with accounting easier.
- 600 transmitters with installation at 170 PLN net each: 102,000 PLN
- 40 trackers at 900 PLN net each: 36,000 PLN
- 2 multi-chargers at 4,500 PLN net each: 9,000 PLN
- total one-off spend: 147,000 PLN net
Why 600 transmitters
Plant roads need a transmitter roughly every 100 m, and inside a building one transmitter per 100-200 m2 is typical. With nine warehouses and a large site, a count of several hundred units is realistic. Position is computed by averaging signals from several transmitters on the map and works without GPS, so transmitter density directly affects position detail. This must be considered when reducing the number of points.
Split of the five-year purchase budget
Subscription after purchase: 3,200 PLN per month
After the purchase, the subscription covers software and maintenance of the trackers. In the scenario it is 3,200 PLN net per month, that is 40 times 80 PLN. The 80 PLN rate per tracker is split between tracker maintenance (30 PLN) and the user licence (50 PLN).
The monthly rate typically covers a dedicated instance, licences, the training module, backups, updates and security patches, and support without billing man-hours, with 99.5% availability in a month. Availability, response and repair parameters (SLA) are set in the maintenance contract. For the budget this means a predictable, fixed operating cost.
The licence is counted per active user, meaning an account with at least one login in a calendar month. Therefore, before signing, agree who the supplier counts as a user, and check whether the number 40 matches the real number of people with trackers.
Five-year budget step by step
Sample five-year calculation for the purchase scenario: 147,000 PLN plus 60 months times 3,200 PLN gives 339,000 PLN net. The one-off spend is 43% of this amount (147,000 divided by 339,000), and the subscription is 57%.
Year by year: in year one, 147,000 PLN plus 12 times 3,200 PLN, which is 185,400 PLN. In years two to five, 38,400 PLN per year. Cumulative spend is 185,400, 223,800, 262,200, 300,600 and 339,000 PLN net. VAT at 23% is added to the net amounts, and its settlement is determined by the plant's accounting.
- year 1: 185,400 PLN (investment plus 12 months of subscription)
- year 2: 38,400 PLN, cumulative 223,800 PLN
- year 3: 38,400 PLN, cumulative 262,200 PLN
- year 4: 38,400 PLN, cumulative 300,600 PLN
- year 5: 38,400 PLN, cumulative 339,000 PLN
Cumulative net spend by year
Buying or leasing transmitters: the break-even point
For the transmitters alone a break-even point can be calculated. The reference price list gives rental of a transmitter at 7 PLN net per month for up to 500 units, and 3.5 PLN above 6,000 units. For the sample calculation we assume that 7 PLN applies to 600 units. This is a cautious assumption, because the rate for intermediate volumes is set in the quotation. Rental would then cost 4,200 PLN per month.
Buying transmitters with installation costs 102,000 PLN. Divided by 4,200 PLN, this gives about 24 months, so after two years purchase is cheaper than rental, if the network serves for longer. Over a five-year horizon the difference is clear, but keep three caveats in mind: under rental, battery replacement about every 4 years is included in the service, while with purchase it must be planned separately; owned equipment requires an asset register and depreciation; capital tied up in devices is not available for other investments.
Recommendation and agreements before ordering
Purchase makes sense when the plant plans to use the network for at least five years, has an investment budget and wants a low, predictable subscription. A subscription with devices is better when the investment budget is closed and the spend should fall into operating costs.
Before ordering, agree with accounting how the items are classified: transmitters and trackers as fixed assets or equipment, implementation and licences as service costs. Also decide who at the plant is responsible for the equipment inventory, battery replacement and charging of the trackers.
Five-year budget for the owned purchase
| Parameter | Value |
|---|---|
| Transmitters with installation (600 pcs at 170 PLN) | 102 000 PLN net |
| Trackers (40 pcs at 900 PLN) | 36 000 PLN net |
| Multi-chargers (2 pcs at 4,500 PLN) | 9 000 PLN net |
| Subscription (40 times 80 PLN) | 3 200 PLN net/month |
Result: 147,000 PLN plus 60 times 3,200 PLN = 339,000 PLN net over five years
Note: Sample calculation. Indicative ranges from 2025-2026 deployments; individual pricing. Net amounts, excluding 23% VAT.
Video
Frequently asked questions
Do the devices belong to the plant after the purchase?
Yes. In the model of selling devices with licences under a subscription, the hardware becomes the customer's property. The subscription covers software, maintenance and support.
Does the 3,200 PLN subscription include support?
The monthly rate covers the instance, licences, the training module, backups, updates and support without billing man-hours, with 99.5% availability in a month.
How long does installation take after the order?
Installation takes 2 to 10 weeks from the order, depending on the number of points and the scope. The contract is concluded for an indefinite period with monthly notice.
Do the amounts include VAT?
No. All amounts are net, and 23% VAT is added separately. The ranges are indicative, and pricing for the plant is individual.