Cost of a crew trip to a remote site and refused entry

A service crew trip to a remote energy site that ends in refused entry because of missing training costs, in a sample calculation, about 1,320 PLN per trip. The refusal can be caught before departure if permissions are checked in the system and the personal QR code is issued to a person only after the required training is completed.

approx. 1,320 PLN
cost of one failed trip (sample calculation)
Source: sample calculation
55 min
call aggregation window for the company coordinator
Source: card
approx. 11,880 PLN
annual saving on the assumptions of the calculation
Source: sample calculation

Why a refused entry at a remote site costs the most

A distributed site, such as a substation, a pumping station or a small generation unit, lies far from the crew's base and often from the client's base too. A refused entry at the gate means the full travel cost has been paid and the work did not start. If the reason is missing valid training, the crew cannot make up for it on site.

What makes up the cost of one failed trip

It includes the crew's working time spent on travel there and back, the cost of the service vehicle, and the delay of the order, which has to be rescheduled. The first two items can be counted directly. The third depends on how urgent the work at the site is.

Why does a call to the duty officer not help at the refusal?

The duty officer cannot shorten a requirement if missing training is a condition of entry. A phone call at the gate ends in a conversation that does not change the verdict. The decision should be made before departure, not at a closed gate.

Sample calculation: one trip ending in refusal

The figures below are a sample calculation with our own assumptions, not data about a specific plant. It assumes a two-person crew, 4 hours of travel in total, a rate of 120 PLN per working hour per person, and a distance of 300 km there and back at 1.20 PLN per km.

Crew working time costs 2 persons x 4 hours x 120 PLN, which is 960 PLN. Travel costs 300 km x 1.20 PLN, which is 360 PLN. The total is 1,320 PLN per trip, without valuing the delay of the order.

Components of the cost of one failed trip (PLN)

Components of the cost of one failed trip (PLN)Bar chart: crew working time 960 PLN, travel 360 PLN, total 1,320 PLN for one failed trip.050010001500PLNCrew working time: 960 PLN960 PLNCrew working timeTravel: 360 PLN360 PLNTravelTotal: 1320 PLN1320 PLNTotal
Source: Sample calculation: 2 persons, 4 hours, 120 PLN/h, 300 km at 1.20 PLN

How the system checks permissions before departure

The permission check in the system makes the entry verdict known in advance. The security screen at the gate gives a verdict after scanning the QR badge or RFID card: whether the person may be on site results from training, qualifications for hazardous work, a permit in progress and an active account. The same conditions can be checked in advance in the panel.

Personal QR code only after training

A person receives a single message with a personal QR code only once the required training is completed. Single delivery is guaranteed by an atomic marker in the database. In practice, the absence of the code on a phone is a signal for the crew leader that the training is not closed, even before the crew gets into the car.

External company visit and the work permit

A planned visit by an external company replaces the work permit for one day, but training, qualifications and an active account still decide entry. The system calls the supervisor once at the first entry, so the inviting person knows the crew is on site.

Missing training alarm at the gate

If someone nevertheless arrives at the gate without the required training, the missing training alarm creates an alarm permit and notifies the company coordinator. Calls are aggregated into one per company within a 55-minute window, so the coordinator does not get a flood of calls when several people arrive at once.

Unattended kiosk

Registration kiosks work without supervision, with only a scanner. A trained person is welcomed, while an untrained one is shown the introductory training. Access to the kiosk is protected by a token that the administrator can change.

Annual saving: sample calculation

If an external company makes 12 trips a year that end in refusal, the cost is 12 x 1,320 PLN, which is 15,840 PLN. Assume that the permission check before departure catches three quarters of such cases. Three refusals remain, costing 3,960 PLN, and the difference is 11,880 PLN a year.

The three-quarters assumption is a sample. The real value depends on how many gaps come from unfinished training and how many from events that cannot be foreseen, such as a breakdown or a change in the scope of work on site.

Annual cost of refusals (PLN)

Annual cost of refusals (PLN)Before and after chart: 15,840 PLN a year without the check and 3,960 PLN with it.0500010,00015,00020,000PLNWithout the check before departure: 15,840 PLN15,840 PLNWithout the check before departureWith the check before departure: 3960 PLN3960 PLNWith the check before departure
Source: Sample calculation: 12 refusals a year, three quarters caught before departure

What to do so the check before departure works

Technology is not enough if the process stays with one person. Planned visits, training and accounts should be in one place, and the crew leader should get into the habit of checking the QR code a day in advance.

  • schedule the visit in the system with adequate lead time
  • check that each crew member has valid training and qualifications
  • confirm that everyone has their personal QR code on their phone
  • name the site supervisor and the coordinator of the external company
Example calculation

Annual cost of refused entries

Assumptions
ParameterValue
Number of people in the crew2 persons
Travel time there and back4 hours
Hourly rate per person120 PLN
Distance there and back300 km
Travel cost1.20 PLN/km
Refusals per year12 trips
Refusals caught before departure75 %

Result: 1,320 PLN per trip; 15,840 PLN a year without the check and 3,960 PLN with it; difference 11,880 PLN a year.

Note: Sample calculation on our own assumptions, without valuing the delay of orders and without data about a specific plant.

Video

Frequently asked questions

How much does a crew trip ending in refused entry cost?

In the sample calculation about 1,320 PLN: 960 PLN for the working time of two people and 360 PLN for travel. The delay of the order is not included.

How do I check the crew's permissions before departure?

The QR code reaches the person only after the required training is completed, so a missing code on the phone signals a gap. The entry conditions can also be checked in the panel.

What happens when someone arrives at the gate without training?

The missing training alarm creates an alarm permit and notifies the company coordinator. Calls are aggregated to one per company in a 55-minute window.

Does a visit by an external company release people from training?

No. A planned visit replaces the work permit for one day, but training, qualifications and an active account still decide entry.

Check permissions before the trip