InnerWeb
Skip to main content

Checklist for the service gate of an energy facility

The service gate of an energy facility works correctly when the scanner, browser, kiosk token and checkout schedule have been checked before the crew's first entry. The checklist below guides you through eight points, with a comment on what exactly should happen and how to check it on site.

5 s
duplicate suppression window for a double scan
Source: card
512
limit of the recognised scanner code length (characters)
Source: card
12 h
threshold for automatic checkout
Source: card

How to use this list

The list is intended for the integrator and the chief of security, who accept the service gate of an energy facility before it starts up. Each point has one control question and one action that can be done in a few minutes at the gate. The result of each point is recorded in the acceptance protocol.

The gate works on one rule: the scan itself is an act of control and records the entry. There is no separate open button, and every scan, including a blocked one, goes to the entry and exit register. That is why configuration errors show up at once in the register.

Scanner and browser

The first four points concern the scanning path: from the code on the badge to the verdict on the security screen. Errors in this part come out most often, because scanners from different manufacturers behave differently.

Scanner mode: USB keyboard (HID) or USB-COM serial port

The scanner can work as a USB keyboard (HID) or as a USB-COM serial port through Web Serial in Chrome or Edge. Check which mode the scanner is in, and whether the browser at the station supports the chosen mode. After switching the scanner to USB-COM there should be no double reading.

Two CDC ports on a USB-COM scanner

A scanner switched to USB-COM may expose two CDC ports, so the system opens and reads both and rejects duplicates within a 2,584 ms window. During acceptance, scan the same code once and make sure one entry appears in the register.

Keyboard layout and Caps Lock

Recognition of the scanner's code has a length limit of 512 characters and a second matching attempt for a reader set to AZERTY layout or with a wrong Caps Lock. A real HID scanner does not always return a clean lowercase address. Scan the code with Caps Lock on and check that the system recognises it.

Duplicate suppression

A double scan of the same code within 5 seconds is suppressed as a duplicate, so that a slower response does not overwrite a faster one on the security screen. At acceptance, scan the same code twice in a row and check that the screen shows the verdict from the first scan.

Time windows of the service gate (seconds)

Time windows of the service gate (seconds)Chart shows the USB-COM duplicate rejection window of 2.584 seconds and the double scan suppression window of 5 seconds.012345sUSB-COM duplicate rejectionUSB-COM duplicate rejection: 2.58 s2.58Double scan suppressionDouble scan suppression: 5 s5
Source: Cell card: Security Guard Panel and gate control

Kiosk token and badges

The next points concern the unattended kiosk and the badges worn by the service staff. An unattended energy facility has no security at the gate around the clock, so the kiosk and the badge must work without human help.

Kiosk token

Registration kiosks work without supervision, with only a scanner: a trained person is welcomed, while an untrained one is shown the introductory training. Access to the kiosk is protected by a token that the administrator can change. Check who knows the current token and whether it was changed after acceptance.

Badge QR token

The badge QR token is random (32 bytes from a random generator), does not derive from a number or a date, and can be revoked. Revocation issues a new badge, and the history of previous ones remains. The public link on the badge does not validate permissions and reveals nothing to a person who only photographs the code with a phone.

Checkout and register

The last point concerns closing entries. The automatic checkout command closes the entries of people who have been on site for more than 12 hours and marks the record as closed automatically. It runs daily at midnight from the scheduler.

At acceptance, check that the schedule is enabled and that an automatically closed record is clearly distinguishable in the register from an exit scanned by the person. This way the list of people on site does not grow with those who forgot to scan their exit.

Checklist

Video

Frequently asked questions

Is there an admission button at the gate?

No. The scan itself is an act of control and records the entry. Every scan, including a blocked one, goes to the entry and exit register.

Why can a USB-COM scanner give a double reading?

A scanner switched to USB-COM may expose two CDC ports. The system reads both and rejects duplicates within a 2,584 ms window.

What happens if someone photographs the code on a badge?

Nothing. The public link on the badge does not validate permissions and reveals nothing. The QR token is random and can be revoked.

When does an entry close automatically?

When a person has been on site for more than 12 hours. The command runs from the scheduler daily at midnight and marks the record as closed automatically.

Let's accept the gate together

We will go through this list at the service gate with your integrator and record the results in the acceptance protocol. Tell us when we can come.

Let's talk