Access to Unmanned Sites: QR Code Scan Instead of a Guard

A station without a guard does not have to mean a station without control. The service crew receives a personal QR code only after completing training, and a scanner kiosk checks their permissions and records the entry on its own. Below is a rollout scenario for a power operator with unmanned sites, where nobody has to stand duty at the gate and the audit trail stays in the register.

12 h
after this time an entry is closed automatically
Source: feature card: automatic checkout
55 min
call aggregation window to the company coordinator
Source: feature card: missing-training alarm

The problem: an unmanned station and an outside crew

Stations, switchgear and heat points spread across a region rarely have permanent staff, yet they still need regular service visits: inspections, replacement of components, meter readings and fault repairs. The first question is always the same: who checked that this particular person is allowed in, when there is no one to ask at the gate.

In practice three workarounds are common. The first is a shared lock code that circulates between companies and does not identify any person. The second is a phone call to the dispatcher asking for a remote opening, which burdens the duty desk and leaves no verified list of permissions. The third is a paper key list filled in after the fact. None of these answers the auditor's question: did the person entering that day hold valid training and qualifications?

The scenario described here is a concept for an operator such as a power plant or heating plant with a dozen or more unmanned sites. It is not tied to a specific installation and does not describe a completed rollout. It combines functions the system already has into a single path for the service crew.

The person's path: from training to the QR code

The core of the solution is the order of events. A person from an external company does not receive a QR code automatically on the day of the visit. The code is sent to them in a single message only after the required training has been completed, and an atomic flag in the database guarantees that the message is sent once. This way there are never two different codes for the same person, and no code exists without training.

The code is random: 32 bytes from a random number generator, unrelated to the employee number or date, so it cannot be guessed or calculated from a colleague's code. It can be revoked. Revocation issues a new badge and the history of previous badges is kept, which helps when a badge is lost or when a person leaves the service company.

The public link encoded in the badge reveals nothing to someone who photographs the code with a phone. It does not check permissions and shows no data, so a photo of a badge taken from a coverall pocket gives an attacker no information. The decision is made only after the scan at the kiosk, in the system.

  • Training required for a given site is assigned to the role and completed before the code is issued.
  • The message with the code is sent once, and reissuing requires revoking the previous badge.
  • The code is random and revocable, and the link in the badge reveals no data.

Time windows in scan handling

Time windows in scan handlingHorizontal bar chart of three time windows: 2.584 s, 5 s and 13 s051015sUSB-COM port duplicateUSB-COM port duplicate: 2.58 s2.58Double scan suppressionDouble scan suppression: 5 s5Evacuation list refreshEvacuation list refresh: 13 s13
Source: Feature cards: USB-COM scanner, duplicate suppression, evacuation list

A scanner kiosk instead of a security post

An unmanned site has a registration kiosk with a scanner, working without supervision. It greets a trained person and shows the verdict. A person without the required training is offered the introductory training on the spot instead of being refused. Access to the kiosk itself is protected by a token that the administrator can change if a leak is suspected.

The scan is an act of control: it records the entry, and there is no separate button to let someone in. Every scan, including a blocked one, goes into the entry and exit register. This matters for audits, because a failed entry attempt is also an event that someone may later ask to see.

The verdict screen checks several conditions: training, qualification for hazardous work, an open work permit and an active account. The same mechanism stands behind the gate security screen of a large plant, so the operator keeps one set of permission logic for gates with and without staff.

External company visit and the on-site contact person

A service crew usually comes on an order, not on a standing permit. A planned visit by an external company replaces the work permit requirement for one day, but training, qualifications and an active account still decide whether entry is allowed. The system calls the operator's contact person once, at the first entry, so that someone on the operator's side knows the crew is on site.

If someone arrives without the required training, the missing-training alarm at the gate creates an emergency permit and notifies the company's coordinator. Calls are aggregated into one per company within a 55-minute window, so that a crew of five people does not generate five calls to the same coordinator.

The scanner in practice: HID, USB-COM and duplicates

The scanner can work as a USB keyboard (HID) or as a USB-COM serial port via Web Serial in Chrome or Edge. A scanner set to USB-COM may expose two CDC ports, so the system opens and reads both, and rejects duplicates within a 2584 ms window. This detail takes days during a pilot if it has not been planned for.

Code recognition has a 512-character length limit and a second matching attempt for a reader set to the AZERTY layout or with a wrong Caps Lock state, because a real HID scanner does not always return a clean lowercase address. A double scan of the same code within 5 seconds is suppressed as a duplicate, so that a slower response does not overwrite a faster one on the screen.

It is worth specifying the operating mode, keyboard layout and configuration method in the scanner purchase specification, because this determines whether the service crew sees the verdict after the first scan or after the second.

Result: an audit trail without a duty desk

After rollout the operator has, for each day, a register of who entered the site, when, and with what verdict. Automatic checkout closes entries forgotten at exit after 12 hours and marks them as closed automatically, so the list of people on site does not grow. The security screen and the evacuation list use the same scans.

For the operator the balance is fewer calls to the dispatcher, one permission list instead of several, and proof for an audit that entry was preceded by a training check. The system does not promise compliance with regulations; it supports meeting them and provides the evidence. More on dividing control levels: see the page on three levels of access.

Checklist

Video

Frequently asked questions

Can someone enter the site with a photo of someone else's QR code?

The link in the badge reveals nothing and does not validate permissions, and the code is random. The verdict is reached after the scan at the kiosk, and every scan goes into the register, so the attempt is visible.

What happens when a person has no training?

The kiosk offers the introductory training. The missing-training alarm creates an emergency permit and notifies the company coordinator, and calls are aggregated into one per company within a 55-minute window.

Does the scanner need a special configuration?

The scanner can work as a USB keyboard or as a USB-COM port via Web Serial. The system handles the AZERTY layout and a wrong Caps Lock state, but the operating mode and layout should be defined in the specification.