Where the discrepancy on the list comes from
Entering a facility is a rigid record: a QR scan, a card tap. An exit is a gesture that is easily forgotten, because the crew hurries to the next facility or leaves through a side door. With a dozen or so scattered sites the difference is visible after just a few days: the list of people on site grows, although nobody is there any more.
An inflated list has two effects. Operational: the dispatcher sees people who left long ago and loses trust in the view of who is on site. Safety: during an evacuation the list contains ghosts, and rescuers lose time searching for people who are not there.
Practice 1: close entries after 12 hours
The automatic checkout command closes entries in which a person has been listed on site for longer than 12 hours, and marks the record as closed automatically. It runs daily at midnight from the scheduler.
Reasoning: the 12-hour window covers a normal shift with a margin, and at the same time does not let an entry hang for days. If the plant has longer continuous works, the threshold should be written into the procedure deliberately, not inherited from the default value.
Numbers that control the list of people on site
Practice 2: mark automatic closures
A record closed automatically should be distinguishable from a record closed by a scanned exit. This way the report shows how many exits were scanned and how many were closed by the system, and you can discuss specific numbers with the service company.
Match the response to the indicator: when the share of automatic closures for one company grows, the problem is that company's exit procedure, not the system.
Practice 3: do not rely on midnight alone, look at the position
The heartbeat of a beacon or tag carries signals from the transmitters received, the signal strength, the battery and the status, and from these the system calculates the position and drives automatic attaching and detaching of permits. Where the facility has location, the absence of a signal from a card for many hours is additional evidence that the person has left.
Reasoning: closing after 12 hours is a safety net, not the only mechanism. The position from the transmitters shortens the time during which the list is wrong.
Practice 4: link with working time records
Gate scans can feed working time records (mRCP) with daily, monthly and annual views, exception queues, a timesheet in PDF and a reminder by phone about an unscanned exit. The module is disabled by default and is enabled by the administrator.
Reasoning: a phone reminder about an unscanned exit solves the problem at the source. Closing at midnight works only where the reminder did not arrive.
Practice 5: the evacuation list has six groups
The evacuation list is built from QR scans at the gate, refreshes every 13 seconds and divides people into six groups: guests, couriers, suppliers, plant employees, external companies and uncertain. Trade-offs are resolved in favor of showing too many people rather than too few.
The uncertain group is where entries with an unclear status go. A rescuer knows not to skip them, but also does not treat them as certain. Checkout after 12 hours shrinks this group, because it closes old entries.
Practice 6: training and the contact person are part of the exit
A planned visit by an external company replaces the permit requirement for one day, and the system calls the contact person once at the first entry. The contact person is the natural addressee of the question whether the crew has already left. Write them into the visit closing procedure, so the dispatcher has someone to call before midnight.
Checklist
Video
Frequently asked questions
When does the system close a forgotten entry?
The command closes entries in which a person has been listed on site for longer than 12 hours, and it runs daily at midnight from the scheduler. The record is marked as closed automatically.
Does automatic closure affect working time records?
The mRCP module is disabled by default and is enabled by the administrator. Exception queues let you review entries without a scanned exit, and a phone call reminds about the missing scan.
Will rescuers see people with an uncertain entry?
Yes. The evacuation list has an uncertain group and resolves trade-offs in favor of showing too many people rather than too few.
Let's tidy up the list of people on site
We will show how automatic checkout, the exit reminder and the evacuation list work together at your operator's facilities.
Let's talk