Cost of covering a 20,000 m2 mill hall with transmitters: count and 5-year subscription

A 20,000 m2 hall is a typical starting point in a heavy plant, and the budget depends on two numbers: how many transmitters must be installed and which maintenance subscription to assume. Below, three variants are calculated over 5 years, with explicit assumptions, so that the purchasing department can replace them with its own data from an on-site measurement.

89 to 200
transmitters for a 20,000 m2 hall
Source: sample calculation
PLN 97,380
5-year subscription, variant A, net
Source: sample calculation
PLN 144,000
5-year subscription, variant C, net
Source: sample calculation

How many transmitters for 20,000 m2: three variants

The InnerWeb placement rules set a density for building interiors of 1 transmitter per 100 to 200 m2. For a 20,000 m2 hall this gives between 100 and 200 units. The design assumption for a hall is 1 point per 225 m2, which means a grid of about 15 m and, for 20,000 m2, 89 points (20,000 divided by 225, rounded up).

These numbers are a starting point for the budget, not a final design. The rules must be validated on site, and BLE range in steel structures is verified by measurement before the final placement of transmitters. In a rolling mill with dense structures and cranes, the measurement result usually moves the count towards the upper end of the range, which is why the budget is planned on a conservative variant with a reserve.

  • variant A: 89 transmitters (1 point per 225 m2),
  • variant B: 100 transmitters (1 per 200 m2),
  • variant C: 200 transmitters (1 per 100 m2).

Structure of the maintenance subscription

A sample maintenance subscription from one offer consisted of three parts: 200 transmitters at PLN 7 each, a server and licences for PLN 800, and the rental of 2 watches at PLN 100 each, giving PLN 2,400 net per month in total. These are indicative ranges from 2025 to 2026 deployments; pricing is individual.

In this structure, cell replacement for the transmitters is included in the subscription, because it is a service task. One offer included it at about every 4 years. For the plant, this means one monthly line item instead of several separate orders, which simplifies budgeting over 5 years.

5-year maintenance subscription, net

5-year maintenance subscription, netBar chart: PLN 97,380 for 89 transmitters, PLN 102,000 for 100, PLN 144,000 for 200050,000100,000150,000PLNA: 89 transmitters: 97,380 PLN97,380 PLNA: 89 transmittersB: 100 transmitters: 102,000 PLN102,000 PLNB: 100 transmittersC: 200 transmitters: 144,000 PLN144,000 PLNC: 200 transmitters
Source: Sample calculation based on the assumptions in the section Five-year calculation; indicative ranges from 2025 to 2026 deployments

Five-year calculation

We assume a rate of PLN 7 net per transmitter per month, a server and licences at PLN 800, and the rental of 2 watches at PLN 200 per month, as in the sample subscription. Variant A (89 transmitters): 623 + 800 + 200 = PLN 1,623 per month, which is PLN 97,380 net over 60 months. Variant B (100 transmitters): 700 + 800 + 200 = PLN 1,700, which is PLN 102,000. Variant C (200 transmitters): 1,400 + 800 + 200 = PLN 2,400, which is PLN 144,000.

The difference between the cheapest and the most expensive variant is PLN 46,620 net over 5 years, which is about 32% of the value of variant C. This is the order of magnitude of error the plant would make if it froze the budget without an on-site measurement.

What this calculation does not cover

The figures above concern the hall alone. Platforms are counted separately, at 1 point per 15 m of walkway, and floors and stairwells according to separate receiving points on each level. Plant roads around the hall require an additional grid about every 100 m. The budget also has to include installation and the coverage measurement after installation.

The calculation does not include the cost of equipment for the deployment, because it depends on an individual quote and on the version of the transmitters. The ATEX version for zones 2 and 22 costs more than the standard one, so if part of the hall lies in an Ex zone, that part must be costed separately once the zone classification is established.

How to use the result in the discussion with management

Management usually asks whether the budget is certain. The honest answer is a range with an explanation of what narrows it: an on-site range measurement, the outcome of the Ex zone classification and the decision on the broadcast interval. For comparison, in another calculation the maintenance fee per transmitter was PLN 5 net per month, so the rate should be treated as a negotiable item in the request for quotation, not as a fixed figure.

A good practice is to put three density variants into the request and require a price for each. This makes it possible to compare offers without recalculating after the measurement.

Example calculation

Maintenance subscription for a 20,000 m2 hall, 5-year horizon

Assumptions
ParameterValue
Hall area20,000 m2
Rate per transmitter7 PLN net per month
Server and licences800 PLN net per month
Rental of 2 watches200 PLN net per month
Horizon60 months

Result: Variant A (89 transmitters): PLN 1,623 per month, PLN 97,380 over 5 years. Variant B (100): PLN 1,700, PLN 102,000. Variant C (200): PLN 2,400, PLN 144,000. All net.

Note: Sample calculation; indicative ranges from 2025 to 2026 deployments; individual pricing. Excludes platforms, roads, installation and ATEX execution.

Video

Frequently asked questions

Where does the figure of 89 transmitters come from?

From the design assumption of 1 point per 225 m2: 20,000 divided by 225 gives about 88.9, which rounds up to 89 units.

Does the subscription include cell replacement?

In the sample maintenance offer, yes, at about every 4 years. The scope must be confirmed in the request for quotation.

Is PLN 7 per transmitter the binding price?

No. It is an indicative value from a sample offer. Pricing is individual.

What changes the budget the most?

The grid density confirmed by a range measurement in the hall, and the part of the area that lies in an Ex zone.

Let's count the budget for your hall

Send us the hall plan and the building parameters. InnerWeb will present a density and subscription variant with explicit assumptions.