Why moving a line changes the risks
Risks are assigned to locations at every level: hall, area, line and workstation. When a line changes place, its surroundings change: neighbouring machines, transport routes, exposure zones. Risks assigned to the line still apply, but area risks may already be different.
Moving a location between production lines on the map is saved, so the inheritance of risks from the line remains correct. The system does not lose assignments, but it is the maintenance manager who is responsible for checking whether the set of risks still matches reality.
What to check in the map editor
The 3D map editor shows in its left column the risks of all levels on the path of the selected node: hall, area, line, workstation. The risks are listed one per row with a pictogram, a name and protective measures. For every moved node review the whole path, not only the line level.
The editor is available to the administrator role, so changing assignments does not require a separate permission. A risk created in the level window is assigned to that level immediately, and after saving the catalogue reloads, so that the tile does not show the old name and the old sign.
Watch out for global risks
Changing the name, description, measures or assessment of a risk applies everywhere the risk is used: in other areas, in types of high-risk work and in issued permits. The editor shows a clear warning about this. After moving a line, therefore, do not correct a global risk if the change concerns only one place.
Instead, create a new risk or assign another existing one to the correct level. This way the other areas keep their assessments and measures.
When to return to the risk assessment
Moving a line is an event that requires a human decision. The system keeps the assignments, but it does not assess whether the new layout has changed the probability, exposure or severity. The documentation does not describe automatic risk assessment, so the assessment is performed and approved by the safety team.
After a change of layout it is worth planning a short meeting: the maintenance manager, the safety team and the line supervisor. Together they go through the checklist, review the risk path in the editor once more, and establish whether any risk needs a new assessment.
Only after such a review are further permits issued for this place. Permits already issued for the old line position are best withdrawn and reissued, so that the printout shows the current risk sections.
Proof for the audit after a change of layout
The auditor usually asks three things: when the layout was changed, who reviewed the risks, and whether permits issued after the change have current risk sections. A checklist with a date and the signature of the responsible person answers the first two questions, and the permit printout answers the third.
The system provides proof for the audit in the form of saved assignments and printouts, but does not promise compliance with a specific requirement. The assessment of compliance rests with the plant.
Checklist
Video
Frequently asked questions
Do risks disappear after a line is moved?
No. The move of a location between lines is saved, and the inheritance of risks from the line remains correct.
Who can change risk assignments on the map?
The 3D map editor is available to the administrator role, so a separate permission is not needed.
What is the risk of changing a global risk?
The change applies everywhere the risk is used, including in issued permits. The editor warns about this clearly.
Does the risk assessment have to be repeated after a move?
The assessment is performed by a person. If the change of layout affects the hazards, the safety team should reassess them.
Put the risks in order after the layout change
We will show a review of the risk path in the map editor and agree who goes through it after each change.
Let's talk