Why a move affects the risks
Risks are assigned to locations at every level: hall, area, line, place. A workstation inherits the risks of all levels above it. When it changes line, the set of risks inherited from the line changes too, and with it the list on the permit printout.
A move of a location between production lines on the map is saved, so the inheritance of risks from the line stays correct. The system does not require risks to be rewritten by hand from one line to another, but it also does not assess whether the new line introduces hazards that call for an additional measure.
Step 1: review the risk path before and after
In the map editor the risks of all levels on the path of the selected node are shown in the left column. Before the move, save or take a screenshot of the list for the workstation, and after the move open the path again. The difference between the two lists is exactly the change that needs to be assessed.
If the new line adds a risk the workstation did not have before, for example forklift traffic or high temperature, establish whether the workstation is still safe in this configuration. If a risk has disappeared, check whether that is intended and not the result of a mistake in the assignment.
Example: risks inherited by a workstation before and after the move
Step 2: assess the protective measures of the new line
In the editor the risks are a list, one per row: pictogram, name, protective measures. Review the measures of the risks inherited from the new line and check whether they can be applied at the moved workstation. A measure that is correct for an assembly line may be impossible at a maintenance workstation, for example a required guard may be out of reach during service work.
If the measures do not fit, do not edit the global risk, because the change applies everywhere the risk is used. Create a risk matched to the workstation and assign it to the right level.
Risks added by requesters
Risks added by a requester to a permit do not move with the map. After the move, check the open permits for the workstation and ask the requesters to verify the list of risks, because they may have been added with the previous line in mind.
Step 3: verify the printout and open permits
Issue a test permit printout for the moved workstation and check whether the location hierarchy section shows the risks of the new line and the old line has disappeared. Pay attention to additional locations: if a permit covers several places, each of them brings its own risks.
Remember that a risk is never printed twice on the printout. If two lines have the same risk, it appears once, which is correct, but it is worth checking whether this hides a difference in the measures.
- Save the list of the workstation's risks before the move.
- After the move, open the risk path in the left column of the editor.
- Compare the lists and assess every new and removed risk.
- Check whether the protective measures of the new line fit the workstation.
- Issue a test printout and verify the location hierarchy section.
- Review open permits and risks added by requesters.
Step 4: record the change and notify people
Record in the plant documentation the date of the move, the person who carried it out and the result of the risk assessment. Notify the manager of the new line that the workstation is taking over with its own set of measures, and the manager of the old line that the workstation has left their area.
For large layout changes, for example the rebuilding of a whole hall, plan a review window: after the moves are finished, go through the risk paths for all workstations of one line and confirm that nothing was omitted. The system supports documentation, and safety decisions are made by the designated people.
Video
Frequently asked questions
Do risks have to be rewritten by hand after the move?
No. The move of a location between lines is saved, so inheritance of risks from the line stays correct.
Will the system assess whether the new line is safe for the workstation?
No. The risk assessment is carried out and approved by a person. It is worth comparing the risk lists before and after the move.
Where can I see the risks of a moved workstation?
In the left column of the 3D map editor, which shows the risks of all levels on the path of the selected node.
Let's rehearse a workstation move during the demo
We will show the move of a location between lines and the comparison of risk paths before and after the change.
Let's talk