What a global risk means
A risk is an element of the global catalogue, not a copy for an area. A change to its name, description, measures or assessment applies everywhere the risk is used: in other areas, in dangerous work types and in issued permits. The editor shows a clear warning about this.
For the person implementing the system this is good news, because one entry updates the whole hierarchy. At the same time it is a trap: a fix made for one line changes the content that workers see in completely different halls. The change procedure is therefore more important than the tool itself.
Stage 1: before anyone edits
Establish who has the right to change the content of a risk and who approves the change. Risks are created by the administrator and the OHS role, so it is from these roles that one approving person for the plant should be appointed. Write into the instructions that a change to the content of a risk requires checking where the risk is used and notifying the managers of those areas.
Also decide what to do when a change is needed only locally. If the description for one line is to differ from the others, do not change the global risk. Create a separate risk for that line and assign it only there.
Example: places of use of one risk covered by a change
Stage 2: during the change
Before saving, read the warning in the editor and check the list of places of use, if the plant's instructions require it. Change protective measures with all the places where the risk occurs in mind. A measure that is correct for a press may be impractical for a warehouse, and it will be visible on both printouts.
After saving, the catalogue is reloaded so that the tile does not show the old name and the old symbol. Verify the new name and the symbol on the tile on the map. This is quick proof that the change was saved, and a checkpoint for the auditor.
Issued permits
A change to a risk also covers issued permits. Before editing, check whether there is work in progress whose printout has already been handed to a contractor. The change does not withdraw a printout that workers already hold, so a significant change to protective measures should be communicated separately, for example at the briefing before the shift.
Stage 3: after the change
Record the date, the person and the reason for the change in the OHS change log. The system supports documentation, but the substantive justification is written down by a person. Notify the managers of the areas where the risk is used, and ask them to confirm that the change does not conflict with local rules.
Only after this step is the change complete. Omitting the notification is the most common cause of misunderstandings: a worker sees the new content on the printout, while their supervisor knows the old version.
- Appoint one person to approve changes to risk content.
- Before a change, check where the risk is used.
- When a local change is needed, create a separate risk.
- Check work in progress and issued permits.
- Record the date, the person and the reason for the change.
- Notify the managers of the areas.
Most common pitfalls
The first pitfall: a correction of a typo that in fact changes the meaning, for example deleting a protective measure. The second: adjusting the description to one hall at the expense of the others. The third: editing by too many people without an approval rule. The fourth: no information for contractors who received the printout before the change.
A simple procedure and a short checklist that accompanies every change eliminate all four. Setting up such a procedure takes about fifteen minutes, and it saves the plant disputes about which version of the risk applied on a given day.
Video
Frequently asked questions
Does a change to a risk cover issued permits?
Yes. A change to the name, description, measures or assessment applies everywhere the risk is used, including in dangerous work types and issued permits.
How do I change a risk for one line only?
Do not edit the global risk. Create a separate risk and assign it only to that line.
Does the system warn about the effect of an edit?
Yes. The editor shows a clear warning that the change applies everywhere the risk is used.