InnerWeb
Skip to main content

Safety system accessibility checklist for plant workers

The accessibility of a safety system is checked on three screens: login, start and training. On each of them a worker may meet a language, equipment or personal barrier. The checklist collects control points that the safety manager and the IT team can go through in one afternoon.

3
screens to check: login, start, training
Source: checklist layout
6
languages of the interface and documents
Source: feature card: internationalization

Login screen: can everyone log in

The login screen is the first barrier. A foreign worker, a person in gloves and a person without a company account should reach training without help. The same badge QR code serves four purposes: gate control, an e-mail invitation, control in the hall and login to training on a tablet, so logging in does not have to rely on typing text.

The badge scan does not log in on its own: the screen shows the first name, last name and company of the code's owner, and the training starts after confirmation. Check that the confirmation is readable, has a large button and does not disappear after a few seconds.

  • badge scan instead of typing a login
  • readable confirmation of first name, last name and company
  • message and rescan button for an unrecognized code
  • language choice before logging in, not after

Languages: does the worker understand the screen

The system interface and the generated documents work in six languages: Polish, English, German, Finnish, Russian and Swedish. The kiosk training system works in four: Polish, English, Ukrainian and Russian. Check which of these languages cover your workforce, and which training materials you actually have.

Pay attention to the field labels set on the installation: they take priority over translations in every language. A label saved as a pl/en pair changes with the language, while plain text is shown the same in every language. If someone entered a label in Polish as plain text, a foreigner will see Polish text.

Only four data dictionaries have an English variant: work types, risks, preventive measures and safety signs. The other dictionaries are displayed in the language in which they were entered.

Control points by screen

Control points by screenBar chart: four points for login, four for language, three for the start screen, three for training.01234pointsLogin: 4 points4 pointsLoginLanguage: 4 points4 pointsLanguageStart screen: 3 points3 pointsStart screenTraining: 3 points3 pointsTraining
Source: Number of checklist points on this page

Start screen: is only what is needed visible

After logging in, the user sees a grid of tiles. A tile appears when three gates are passed: the user's role, a feature flag and a personal preference saved in the browser. A worker with fewer tiles has less to read and less to mix up.

The administrator sets default hidden tiles separately for each role, and the user can hide unneeded tiles in the filtering section. Check the screen for each role, not only the administrator's, because that is where excess options most often appear.

Training: are the material and the test in the person's language

Training consists of material (PDF slides or video) and a multiple choice test. The library of instructional videos allows choosing the language of the material independently of the interface language and switching on CC subtitles. This helps people who understand spoken language worse than written.

Availability of training in a given language depends on the materials of the given plant. When material is missing, the gate requires training in Polish instead of skipping it. Record who in the plant will help a person in such a situation.

Reporting remarks: can a worker say that something does not work

For external companies the first item in the side menu is the link Write to us with remarks and reports. The message subject has a fixed prefix, and the content includes the screen, the device and the time of the click. This way a report about an accessibility barrier carries information that the reporter often cannot give on their own.

Review the reports once a week in the first month: repeated remarks about one screen are the cheapest source of accessibility fixes.

Checklist

Video

Frequently asked questions

What does system accessibility cover in this checklist?

The login screen, the start screen and training: languages, devices, the way identity is confirmed and the possibility of reporting remarks. The checklist does not replace an audit of compliance with accessibility standards.

How often should it be repeated?

Before the pilot, after adding a new language or role, and after changing labels on the installation. These changes directly affect what the worker sees.

Who should fill it in?

The safety manager together with the IT team, ideally with the participation of a worker from the target group, for example a driver or a foreign worker.

Go through the checklist with us

Book a call: we will check the login, start and training screens on your installation with workers who speak different languages.

Let's talk