InnerWeb
Skip to main content

FAQ: using the plant system with gloves and in hall noise

A worker in thick gloves, in noise and in a hurry cannot type a login or pick an item from a three-level menu. That is why the most important actions in the system have versions that need no keyboard: a watch gesture, a code scan and voice navigation. Below are answers to the questions that hall supervisors and the safety team ask.

3 s
countdown before the SOS alarm is sent
Source: feature card: SOS alarm on a watch
4
uses of one badge QR code
Source: feature card: badge login

How to call for help when typing is not possible

The SOS alarm on the watch is triggered with a button gesture: a triple click or a long press. After the gesture a three-second countdown starts, during which the alarm can be cancelled. The solution was designed for a hand in a glove, because a physical button can be felt through thick leather, while a touch screen often does not respond.

The countdown matters for two reasons. It protects against an accidental alarm that would tie up the dispatcher, and it gives the person in trouble a moment to cancel if the gesture was a mistake. Three seconds is a time that can be counted in noise, without looking at the screen.

Can a confirmation be heard in noise?

It should not be relied on. The noise of the hall is the reason the gesture is based on a button and a countdown, not on a voice command. When planning the pilot, it is worth checking the confirmation under real noise conditions, especially near presses and compressors.

How to enter a section without clicking through the menu

The voice assistant in the system interface lets a logged-in user move by speech to the sections they have permissions for, instead of clicking through the menu. It is limited to navigation: it performs no operations beyond going to a screen, so a spoken sentence will not approve a permit or close a report.

The assistant pilot runs on one server and is switched on by a flag on the server side. On installations without the flag the widget does not appear. When planning work in noise, voice should therefore be treated as an addition for quieter stations, such as the dispatch room, the warehouse or the hall office, and not as the only way to access the system.

What if the user has an unsaved form?

Before moving to another section, the assistant asks for confirmation with the word "yes" instead of silently discarding the entered data. In practice this protects a report started in gloves, which would take several minutes to enter again.

What if a command did not work?

A command repeated right after the previous one is treated as a sign that the first one did not work, and it goes to a log for later review. The supervisor sees in the analytics which phrases cause trouble in noise and can decide to switch the function off at a given station.

Way of operating vs. need to take off gloves

Way of operating vs. need to take off glovesHorizontal bar chart: three actions without taking off gloves, two that require a station.0123actionsWithout taking off glovesWithout taking off gloves: 3 actions3At a stationAt a station: 2 actions2
Source: Split of actions from the gloves section: SOS gesture, badge scan, voice navigation, and report description and forms

How to confirm identity without typing a login

The same badge QR code serves four purposes: gate control, an e-mail invitation, control in the hall and login to training on a tablet. The worker does not choose a company from a list or type a login: they show the badge to the camera.

The scan does not log in on its own. The screen shows the first name, last name and company of the code's owner, and the training starts after a person confirms it. In gloves a single large press of the confirm button is enough. If the screen does not respond through a thick glove, the solution is help from the person at the station, not lowering the confirmation threshold.

Which actions require taking off the gloves

The honest answer is: those that require typing text. Entering a report description, filling in a form or correcting data stays on the keyboard or touch screen and should not be done while wearing gloves.

A good split of actions in the plant looks like this: in gloves you call for help with a gesture, scan the badge and navigate by voice between sections; after taking off the gloves, or at a station, you write the report description, fill in the form and approve the document.

  • watch button gesture: no need to take off gloves
  • badge scan with the camera: no need to take off gloves, confirmation with a large button
  • voice navigation: only where the noise allows it
  • report description and forms: at a station, after taking off gloves

How to check this in the pilot

The glove test should be run at the station, not in the office. The worker performs a sequence: the alarm gesture with cancellation, a badge scan and a move to one section by voice. For each step, the number of attempts needed to complete it successfully is noted, as well as the places where noise made correct recognition harder.

The results give a basis for decisions: whether the voice function should be enabled in the halls or only in the dispatch room, and whether additional posters with the gesture instructions are needed at the hall entrance.

Video

Frequently asked questions

Can the SOS alarm be triggered in thick gloves?

Yes, with a gesture on the watch button: a triple click or a long press. After the gesture a three-second countdown starts, during which the alarm can be cancelled.

Can the voice assistant approve a permit?

No. It is used only for navigating between sections and performs no operations beyond going to a screen.

Does the badge QR code require typing a login?

No. The scan shows the first name, last name and company of the code's owner, and after confirmation by a person the training starts. The form for choosing a company and a login is not displayed.

What about noise and voice commands?

The function is in the pilot and works where the server flag has been switched on. In noise it is treated as an addition, while the gesture and the scan remain the basis.

Test the system in your hall

Book a demo: we will check the SOS gesture, the badge scan and voice navigation at a station, in gloves and in real noise.

Let's talk