How the start screen works
After logging in, the start screen is a grid of tiles. The user hides unneeded ones in the Tile filtering section, and the administrator sets default hiding separately for each role. As a result, an external company employee sees a different screen than the safety manager, without separate installations.
For an administrator in the maintenance phase this is a tool for reducing noise: a new employee sees only what they need, and the other tiles are hidden, not deleted.
Three gates of tile visibility
A tile appears on the start screen when it passes three gates: the user's role, the feature flag and the personal preference saved in the browser. The absence of any one of them is enough for the tile to disappear.
This matters when diagnosing reports of the type: I cannot see the tile. Check in order whether the role has access, whether the flag is on for the installation and whether the user hid the tile on their own device. A preference saved in the browser does not travel between devices, so the same user may see a different screen on a phone than on a computer.
- User role: whether it has permissions to the section.
- Feature flag: whether the feature is enabled on the installation.
- Personal preference: whether the user hid the tile in the filtering.
Practices for setting default hiding per role
Start with a list of tiles for each role, drawn up together with department managers, rather than hiding everything that seems rare. Hide tiles that a role does not use on a typical working day, and keep access to them through the side menu.
Change settings in small steps and record the date of each change. This way, after a problem is reported, it is clear whether the hiding was introduced before the report.
External companies and the Contact us link
For external companies, the first item in the side menu is the Contact us link for remarks and reports. The subject of the message has a fixed prefix, and the content includes the screen, the device and the time of the click. This is a ready feedback channel: the administrator can easily filter reports about the start screen.
Encourage external companies to use this link when a tile is missing. A report with the device and the time shortens diagnosis from a phone call to a single reading.
How to check that hidden tiles do not get in the way
After each change of default settings, carry out a short review: ask two users of the role to complete typical tasks from login and note how many clicks each one takes. If any task requires reaching into the menu for a hidden tile, restore the tile.
Also compare reports received through the Contact us link before and after the change, and check whether users restore hidden tiles on their own. Frequent restoring is a signal that the hiding was wrong.
Checklist
Video
Frequently asked questions
Does a hidden tile disappear from the system?
No. The tile is hidden on the start screen, and access to the section remains through the side menu, provided the role has permissions.
Why does a user see a different screen on a phone and on a computer?
The personal preference is saved in the browser, so it applies to a specific device.
Who sets the default hiding?
The system administrator, separately for each role, in the Tile filtering section.
Want to shorten the start screen for your roles?
Book a talk: we will set up together the list of tiles per role and a way to check whether the hiding helps.
Let's talk