The situation: a boiler house like several buildings in one
A power plant boiler house looks like one building from the outside, but inside it has dozens of levels: catwalks, galleries, platforms around the boiler, ducts and technical shafts. An employee who entered at six in the morning may twenty minutes later be on the ground floor or on a platform several dozen meters higher. For the dispatcher these are two completely different situations, and a plan view shows the same point for both.
Gate control decides whether a person may be on the plant. It does not decide where the person is after entering. This gap is filled by location from transmitters placed in the building separately for each level. The described scenario is a concept for a large energy site, not a description of a completed rollout.
The gate: scan and verdict
The security screen at the gate gives a verdict after scanning a QR badge or an RFID card. Whether a person may be on the plant follows from training, qualification for hazardous work, an open work permit and an active account. The scan itself records the entry, and there is no separate button to let someone in.
This record is the starting point for the person's further history. From the moment of entry the system knows their identity, permissions and the permit they hold. When the employee approaches the building, position from the transmitters adds another dimension: exactly where, within that permit, they are working.
Split of receiver network points in the concept
The building: position from many transmitters
The heartbeat of a beacon or tag carries signals from the transmitters it receives, the signal strength, the battery and the status. From this the system calculates the employee's position in real time and drives the view of who is on site, automatic attaching and detaching of permits, and inactivity detection. The position does not come from a single transmitter, but from averaging the signals of many.
A 3D position requires readings from at least 5 transmitters. Signal strength is normalized with a factor of 110 and averaged over up to 4 readings. This has design consequences: on every level where we want to distinguish the floor, the receivers must be placed densely and in a layout that gives five visible transmitters from any work position.
In a building the general rule is one transmitter per 100-200 m2, and the system works without GPS. In a boiler house, where steel and large metal masses attenuate the signal, the placement design is preceded by BLE propagation measurements and is not calculated from floor area alone.
The proportions of the receiver network for a large site
In the location concept for a large energy site (thousands of employees, several dozen hectares, several dozen buildings), the receiver network counted several thousand points. About 13% were main antennas connected by LAN and PoE, and the rest were small BLE antennas powered at 230 V. An additional 13% was reserve.
The spatial distribution looked as follows: about 88% of the points were in buildings, counted separately for each level, and about 12% outdoors. This reverses the intuition, because an energy site is associated with a yard, while the equipment bill is made up in buildings, especially multi-level ones.
- Main antennas with LAN and PoE: about 13% of network points.
- Reserve: 13%.
- Points in buildings (counted per level): about 88%.
- Points outdoors: about 12%.
What the dispatcher sees
The dispatcher opens the view of who is on site and sees a person assigned not only to a building, but to a level within that building, together with the permit they hold. For an SOS or inactivity event the notification includes the location on the map, so the response team knows which level to head to first.
In this concept the BLE wristband only transmits and is charged once a year. It has an alarm for removal or cutting of the strap and an SOS button, and the required accuracy was 10 m. Data leaves only through the main antennas to the OT VLAN and to servers in the OT network.
Cost and scope of the estimate
The concept estimate covered a site visit, BLE propagation measurements, placement design per level, integration with OT, system adjustment and training. Divided per wristband it gave a figure of the order of 500 PLN one-off and about 5 PLN per month. These are indicative ranges from 2025-2026 rollouts; the individual estimate is separate.
For purchasing, the split matters: the cost depends on the number of levels and the difficulty of propagation, not on the number of people at the gate. The same plant may have four thousand employees and only a few hundred who regularly enter the boiler house.
Video
Frequently asked questions
Why does a position need as many as 5 transmitters?
A 3D position is calculated from averaged signals of many transmitters, and with fewer readings distinguishing the level would be uncertain. That is why the placement design is made separately for each floor.
Does the system work without GPS inside a building?
Yes. The position comes from transmitter signals, not from a satellite receiver. In a building the general rule is one transmitter per 100-200 m2, but in a boiler house the number is confirmed by propagation measurements.
Where does the wristband data go?
In this concept, only through the main antennas to the OT VLAN and to servers in the OT network, without leaving the plant network.
Let's plan location floor by floor
We will carry out a site visit and BLE propagation measurements in the boiler house, and then show the placement design and the dispatcher view.