InnerWeb
Skip to main content

Annual review of the system budget after deployment: checklist

In the twelfth month after go-live, the system administrator and the budget controller share one task: compare actual use with the assumptions from the offer. The biggest savings come from checking active users, the number of transmitters and devices, and the threshold for moving to the fixed package. Below is a checklist with comments and a sample calculation.

8 400 PLN
annual saving of the package with 40 active users
Source: sample calculation
84 PLN
annual cost of one leased transmitter
Source: reference price list

Users and licenses

Start with the number of active users over the last twelve months. A license is counted for an account with at least one login in a calendar month, so the login report shows how many people were paid for. Pay attention to peak months and to the trend: if the number of active users stably exceeds 30, the fixed package may be cheaper than flexible licenses.

Sample bill: with 40 active users, flexible licenses at 80 PLN cost 3 200 PLN per month, and the 50-license package 2 500 PLN net per month. The saving is 700 PLN per month, that is 8 400 PLN per year. The break-even point of the package is at about 32 users, because 2 500 PLN divided by 80 PLN gives 31.25.

Transmitters and devices

The second area is field infrastructure. Compare the number of transmitters on subscription with the number actually in use: the fee is 7 PLN net per unit per month up to 500 units, so each redundant transmitter costs 84 PLN per year. Also check whether the price falls at larger scale (3.5 PLN above 6 000 units) and whether battery replacement about every 4 years is included in the service.

For watches, do a simple purchase versus rental calculation. Purchase costs 1 200 PLN net plus 25 PLN per month for the SIM and management, and rental 100 PLN per month per unit. For four watches the difference in the subscription is 300 PLN per month, and the purchase pays back after 16 months. In month 12 there are therefore about 4 months left to the break-even point, which is worth considering when deciding on a change of model.

Licenses at 40 active users: flexible and fixed package

Licenses at 40 active users: flexible and fixed packageBar chart: flexible licenses 3 200 PLN, fixed package 2 500 PLN per month with 40 users.01000200030004000PLN net per monthFlexible licenses: 3200 PLN net per month3200Flexible licenses50-license package: 2500 PLN net per month250050-license package
Source: Sample calculation: 40 times 80 PLN and the 50-license package at 2 500 PLN net per month

Fixed items and the contract

The third area covers items that do not change but need confirmation. Check whether the monthly rate still includes backups, updates and security patches, and support without billing man-hours. Review the availability report for the last twelve months against the recorded SLA, and check whether the fee was reduced (1% for each hour of a type A failure).

Remember that the contract is open-ended with monthly notice. The annual review is therefore not a renewal date, but it is a good moment to change the billing model, if the change is justified by the data.

Budget for next year

The last step is recording the budget for the following year. In the inactivity detection pilot, the next year is the subscription alone: 12 times 1 550 PLN, that is 18 600 PLN net, with no new one-off items. Add separate lines for planned extensions: new sites (configuration 4 900 PLN net and training module 600 PLN per month), transmitters and licenses.

Add 23% VAT to net amounts. All values in the offers are indicative ranges from 2025-2026 deployments; individual pricing applies, so confirm current rates with the vendor before the budget is approved.

Checklist

Video

Frequently asked questions

Who should lead the annual review?

The system administrator provides the usage reports, and the budget controller compares them with the assumptions from the offer. The decision to change the billing model is made by the person responsible for the system budget.

Can flexible licenses be changed to a package during the contract?

The contract is open-ended with monthly notice, so a change of billing model can be agreed within the year. The terms of the change are confirmed with the vendor in writing.

Does the review also cover the benefits of the system?

This list covers costs. Benefits, for example the response time to inactivity, are assessed separately on the plant's own data, and they are not added to the cost calculation.

Run the review with us after year one

We will analyse the user and transmitter report together and propose a cheaper billing model if the data justifies it. Book a call with the InnerWeb team.

Let's talk