InnerWeb
Skip to main content

Recurring OPEX items before signing a system contract: procurement checklist

Recurring items in a system offer determine costs for many years, and they are often described more briefly than the deployment. Before signing, procurement should check the user definition, the SLA scope, backups, support and batteries. Below is the checklist, and each point has a comment with concrete values from the offers.

99.5%
availability per month in one of the offer variants
Source: offer
4 years
indicative period to battery replacement within the service
Source: offer

Licenses and the definition of a user

The first question concerns who is a license user. Some vendors count only supervisors, others every person entering the site. In the InnerWeb offer a license is counted per active user, meaning an account with at least one login in a calendar month. In the plant subscription variant, guests and drivers are not counted.

Also ask about rates and thresholds: a flexible license costs 80 PLN per user per month with a minimum of 10 users, and a fixed package of 50 licenses costs 2 500 PLN net per month, paid in advance. The break-even point of the package is about 30 active users, so check which side of the threshold your plant is on.

SLA, backups and support

The monthly rate should include a dedicated instance, backups, updates and security patches, and support without billing man-hours. Check whether the vendor has written this into the contract and not only into the offer description. Availability in InnerWeb offers is 99.5% per month in one variant and 99.9% in the reference price list, so the value has to be read from a specific document.

Pay attention to the SLA clauses. SLA parameters (availability, response and repair times) are set in the maintenance contract, for example 99.5% availability per month. From a procurement point of view it matters that the contract clearly describes the SLA parameters, the way failures are reported and confirmed, and names the contact persons on both sides.

Monthly cost of 200 transmitters, server and watches

Monthly cost of 200 transmitters, server and watchesHorizontal bar chart: transmitters 1 400 PLN, server and licenses 800 PLN, watches 200 PLN, total 2 400 PLN per month.050010001500PLN net per month200 transmitters200 transmitters: 1400 PLN net per month1400Server and licensesServer and licenses: 800 PLN net per month8002 watches2 watches: 200 PLN net per month200
Source: Offer for maintenance of a 200-transmitter network: total 2 400 PLN net per month

Devices, batteries and costs outside the invoice

For transmitters on subscription, ask whether battery replacement is included in the service. In the maintenance of a network of 200 transmitters at 7 PLN net per unit per month, battery replacement about every 4 years is included. Also ask about the lease rate at larger scale: up to 500 units 7 PLN per month, above 6 000 units 3.5 PLN.

Finally, check the things that do not show on the invoice: customer equipment, power at mounting points, integrations with existing systems and SLA after deployment. All of these are costs of the plant and often decide the real project cost.

Contract and billing

The last points are formalities. The InnerWeb contract is open-ended with monthly notice, and installation takes 2 to 10 weeks from the order. Deployment is payable in instalments tied to stages, and monthly fees are billed in arrears (flexible licenses) or in advance (fixed package). 23% VAT is added to net amounts, and all price ranges are indicative and require individual pricing.

Checklist

Video

Frequently asked questions

Which item most often changes the cost?

The definition of a license user. It changes the number of paid accounts, and at 80 PLN per license every additional user costs 960 PLN per year.

What should the contract say about the SLA?

SLA parameters (availability, response and repair times) are set in the maintenance contract, for example 99.5% availability per month, together with the way failures are reported.

Does this checklist apply only to InnerWeb?

No, the questions are universal for any offer of a security system on subscription. The numerical values in the comments come from InnerWeb offers.

Let us check the offer together

We will go through your procurement list with you and answer each point for our offer. Book a call with the InnerWeb team.

Let's talk