Costs of migrating an access card fleet: sample calculation

The cost of migrating a card fleet consists of four items: the media, the readers, printing and gatehouse labour. For a site with 1 000 employee cards, 300 cards for external companies and 20 readers, the sample ranges come to roughly 30 000–70 000 PLN net. Below we show how to put them into the budget at the purchasing stage.

30–70 tys. PLN
range of the migration cost for 1 300 cards and 20 readers, net
Source: sample calculation
108 h
gatehouse labour to issue 1 300 cards at 5 minutes each
Source: sample calculation

Scope of the calculation and what is outside the InnerWeb offer

The calculation concerns a site with 1 000 employee cards, 300 cards for external companies and 20 readers on gates and doors. We take this scope as an example because it lets every item be counted separately and the result be easily scaled to your own numbers.

InnerWeb is a software maker and does not manufacture or replace access control readers. The site buys the cards, the readers and their installation from the supplier of its access control system. That is why the prices below are sample assumptions for the budget, not an InnerWeb offer. On the software side, replacing the medium does not change the number of licences, because active accounts are counted.

Four cost items

The first item is the cards. We assume a range of 10–25 PLN net per piece for a 13.56 MHz encrypted card, which for 1 300 pieces gives 13 000–32 500 PLN. The spread results from the card type and the order size.

The second item is the readers. We assume 500–1 200 PLN net per reader with support for encrypted cards, that is 10 000–24 000 PLN for 20 readers. The third is printing and personalisation: 2–5 PLN per card, giving 2 600–6 500 PLN. The card printer comes from a proven supplier or from the client's equipment if it meets the requirements, so it is not added to the calculation.

The fourth item is gatehouse labour. We assume 5 minutes to issue and assign one card, so 1 300 cards is about 108 hours. At a loaded rate of 40–60 PLN per hour this comes to 4 300–6 500 PLN. This item is often left out of budgets, yet it is a real cost, because cards are issued during the site's working hours.

Cost structure: midpoint values of the ranges

Cost structure: midpoint values of the rangesBar chart of cost: cards 22 750 PLN, readers 17 000 PLN, printing 4 550 PLN, gatehouse labour 5 400 PLN0500010,00015,00020,00025,000PLN netCardsCards: 22,750 PLN net22,750ReadersReaders: 17,000 PLN net17,000Card printingCard printing: 4550 PLN net4550Gatehouse labourGatehouse labour: 5400 PLN net5400
Source: Sample calculation based on the assumptions in the calculation section

Total ranges and how to read them

The sum of the four items gives roughly 30 000–70 000 PLN net. The midpoint values are about 49 700 PLN: cards 22 750 PLN, readers 17 000 PLN, printing 4 550 PLN and gatehouse labour about 5 400 PLN. The price of a card and the number of readers to be replaced have the largest effect on the result, so these two figures should be settled first.

These are indicative ranges from the sample calculation, based on the assumptions on this page; the individual quote depends on the access control supplier, the technology and the number of gates. If the readers already support encrypted cards, the reader item drops to zero and the budget closes on cards, printing and gatehouse labour.

Optional items

If visitors enter with a QR code from the invitation instead of a card, there is no need to order cards for them, and the gatehouse needs a QR code reader. This is a cost of the order of 1 000 PLN net per device, outside the InnerWeb offer.

A separate matter is the BLE active card, which is a location device and not an access control card. It costs 220 PLN net one-off, and the housing 40 PLN net. It is not part of the access card migration calculation, but it is worth listing in the budget if the site plans to locate people in parallel with the replacement.

How to calculate your own ranges

Four figures from the inventory are enough: the number of cards, the number of readers to be replaced, the unit price of the card from the request for quote, and the time to issue one card measured at the gatehouse. Insert them into the same formulas and add a margin for spare cards, usually a few percent for losses and damage.

Before the budget is approved, the purchasing department should ask the access control supplier to break its offer down into these same four items, so that the comparison is not distorted by bundles.

  • Number of employee and external company cards.
  • Number of readers to be replaced or upgraded.
  • Unit price of the card and the reader from the request for quote.
  • Card issuing time measured at the gatehouse.
Example calculation

Sample calculation: 1 300 cards and 20 readers

Assumptions
ParameterValue
Employee cards1000 pcs
External company cards300 pcs
Readers20 pcs
Encrypted card price10–25 PLN net/pc
Reader price500–1200 PLN net/pc
Printing and personalisation2–5 PLN net/card
Card issuing time5 min/card
Loaded gatehouse rate40–60 PLN/hour

Result: Cards 13 000–32 500 PLN, readers 10 000–24 000 PLN, printing 2 600–6 500 PLN, gatehouse labour 4 300–6 500 PLN. Total about 30 000–70 000 PLN net.

Note: Sample calculation. Indicative ranges from 2025–2026 deployments; individual quote.

Video

Frequently asked questions

Does InnerWeb sell cards and readers?

No. InnerWeb provides the software and integrates with the existing access control system, while the site buys cards and readers from its access control supplier.

Will replacing the cards increase the licence cost?

No, because licences are counted per active user, not per card. The contract is for an indefinite period with one month's notice.

How can the gatehouse workload be reduced?

By importing the card assignments to people via CSV before the issue day and by issuing cards in waves. Visitors with a QR code do not need a card at all.

Sources

Let's calculate the migration budget for your site

Give us the number of cards and readers and we will prepare budget ranges and a list of questions for your access control supplier. The individual quote follows the inventory.