Questions about money
The first question is usually: how much will it cost? In the sample calculation we assume a site with 1 000 employee cards, 300 cards for external companies and 20 readers on gates and doors. With these assumptions the cost of the whole replacement falls within a range of roughly 30 000–70 000 PLN net, with the largest items being the cards and the readers. These are indicative ranges from the sample calculation; an individual quote depends on the card technology, the number of readers and the rates of the access control system supplier.
The second question concerns software: will InnerWeb charge a fee for the card replacement itself? Licences are counted per active user, so replacing the card medium does not change the number of licences. The contract is concluded for an indefinite period with one month's notice, which means that the card migration does not require a long-term commitment.
Questions about timing and gate downtime
How long will it take? The sample plan has five stages: inventory, a trial on one gate, the wave for employees, external companies and switching off the old format. The schedule depends on shifts and on how quickly the gatehouse issues the new cards, which is why we measure time in weeks rather than days. The installation lead time on the software side is 2 to 10 weeks from the order.
Will the gates stop? They do not have to. Because the transition period is meant to run without interruption, the replacement is spread over stages: the old and the new format work in parallel until the last group has received its new cards. Only then is the old format switched off. Dual-frequency cards, which combine the 125 kHz and 13.56 MHz layouts in one body, allow this transition period to be run on old and new readers at the same time.
Structure of the replacement cost (midpoint values of the ranges)
Questions about the role of InnerWeb
Who replaces the readers? Not us. InnerWeb is a software maker and does not manufacture or replace access control readers. We integrate with the site's existing access control system, so the readers, controllers and cards are ordered by the site from its access control supplier.
So what does InnerWeb do? It receives card punch events from the access control system and links them with working time records, qualifications and permits. All processing, that is recognising entry and exit, grouping into working days, rosters, exceptions and reports, takes place on the InnerWeb side, while the logic of the access control system stays unchanged. As a result, the migration of the card medium does not force a rebuild of the settlements.
Questions about risk
Will punch data be lost during the migration? Events carry an identifier and a time stamp from the controller, so a repeated transmission or an offline queue does not distort the working days. A punch from an unknown card goes to a queue of cards waiting to be assigned, instead of creating an account from an unknown punch, which protects the time records from duplicates during the first days of the new wave.
Why replace cards that work? 125 kHz cards transmit a fixed number without authentication, so copying them is cheap. MIFARE DESFire EV2 and EV3 cards use AES encryption and mutual authentication between the card and the reader, and the OSDP protocol with Secure Channel encrypts communication between the reader and the controller, unlike Wiegand, which sends data in clear text. This is an argument for the security department; the director gets from it evidence for an audit, not a promise of compliance.
What the director should approve
The director's decision comes down to four points: the scope (whether external company cards are replaced or whether they are substituted with QR codes), the schedule of stages, the budget within the ranges and the name of the person on the site side who is responsible for issuing cards. Detailed calculations can be found in a separate article on the cost of the card fleet, and the order of actions in the description of the transition period.
- Scope: employees, external companies, visitors.
- Schedule: five stages with one gate as the trial.
- Budget: ranges, not a single amount.
- Person responsible for issuing cards and handling exceptions.
Video
Frequently asked questions
Can only part of the cards be replaced?
Yes. The plan assumes waves, so first the group with the highest risk or the largest number of entries is replaced. The old format works until it is switched off, so the new and the old card can coexist.
Will visitors also receive new cards?
They do not have to. Entry with a QR code from the invitation and registration at a kiosk limits the number of cards to be replaced, and visitors do not add to the cost of the media.
Will InnerWeb change the current working time settlements?
No. The settlements stay, because after the migration punches still go to InnerWeb. Only the medium and the card number assigned to a person change, through a CSV import.
How quickly will we get a specific quote?
After the inventory of cards and readers. The quote needs figures: how many cards, of what technology, how many readers and which access control system is in use. Prices are given as indicative ranges from 2025–2026 deployments; the individual quote is separate.
Sources