Cost of replacing the card system in a plant of 800 people

The cost of replacing the card system in a plant of 800 people consists of five items: cards, personalization, readers with SAM modules, access control system configuration and integration with the plant's systems. The largest part concerns the readers and lies with the access control supplier, not with the software manufacturer. Below is a sample calculation with explicit assumptions, and an indication of what can be spread over time.

880
cards in the calculation for 800 people with a 10 percent reserve
Source: sample calculation
PLN 123,400
total of the four items in the sample calculation
Source: sample calculation

What the move to encrypted cards costs

The cost of moving from MIFARE Classic cards to encrypted MIFARE DESFire EV2 or EV3 cards is not limited to the price of the plastic. MIFARE Classic cards rely on the broken Crypto1 cipher, so they are not suitable for new deployments that require security, and replacing them means changes on the side of the cards, the readers and the procedures.

For the budget it is best to separate five items, because each has a different owner and a different possibility of being spread over time.

  • Cards: purchase with a reserve for losses and new employees.
  • Personalization: writing the application and keys, assigning a number, printing and linking to the person in the register.
  • Readers with SAM modules: on the side of the access control supplier.
  • Configuration and commissioning of the access control system, including key diversification.
  • Integration of the scan events with the plant's systems, priced individually.

Sample calculation for a plant of 800 people

The calculation below is a sample and rests on the assumptions listed in the calculation box. It is not an offer or a quote. Indicative price ranges from 2025-2026 deployments fall within a similar order of magnitude, but an individual quote always depends on the number of access points, the condition of the existing readers and the scope of integration.

We assume 800 people and a reserve of 10 percent of cards for losses and new employees, which gives 880 cards. The price of an encrypted card is assumed to be 18 PLN per piece, which gives PLN 15,840. Personalization is assumed to take 6 minutes per card, which is 88 hours of work, and at a rate of PLN 120 per hour this comes to PLN 10,560. Readers: 40 units at PLN 1,800 each with a SAM module gives PLN 72,000. Configuration of the access control system and key diversification is assumed at PLN 25,000. The sum of the four items is PLN 123,400, excluding the integration, which is priced individually.

What in this total is on the InnerWeb side

InnerWeb is a software manufacturer and does not sell readers or access control cards. We receive card scan events from the access control system through a webhook and link them with qualifications, permits, attendance and time recording. That is why the reader and card items in the calculation concern the access control supplier, and the price of the scan event integration is a separate, individually quoted item.

Structure of the sample budget (thousand PLN)

Structure of the sample budget (thousand PLN)Horizontal bar chart of the cost structure: readers 72, configuration 25, cards 15.84, personalization 10.56 thousand PLN020406080thousand PLNReaders with SAMReaders with SAM: 72 thousand PLN72KD configurationKD configuration: 25 thousand PLN25CardsCards: 15.84 thousand PLN15.84PersonalizationPersonalization: 10.56 thousand PLN10.56
Source: Sample calculation on the assumptions from the Calculation section

Which items can be spread over time

The easiest items to spread over time are the cards and the personalization. The first stage covers the critical zones and people with broad permissions, and the later stages cover the remaining employees. As a result, the budget for cards and personalization hours is divided into quarters, and the old cards work alongside the new ones until the end of the migration.

Readers are harder to spread, because they must handle both card types during the migration. If the existing readers already support DESFire and AES-128 encryption, this item falls, which the access control supplier confirms before ordering. The configuration of the master key is not spread at all: it must be ready before the first personalization, together with the key administrator role and a separate key backup.

Hidden costs that purchasing tends to forget

The most often overlooked costs are those of the register and the clean-up of accounts. If the same people have two active accounts, one with a card and one without, the training result may sit on the account without a card, and at the gate the person is reported as untrained. During a card replacement these cases surface all at once and burden HR and security.

The second hidden cost is the time for procedures: collecting old cards, destroying or archiving them, and training reception and security staff. It is worth adding these to the calculation as a separate item of hours, even if they generate no invoice.

How to count the budget for your plant

Start with the number of people who need a card, including contractor staff who are permanent on site, and add a reserve. Ask the access control supplier for the number of readers that must be replaced or updated, and confirm DESFire support with AES-128 encryption. Then multiply the personalization time by the number of cards and by the hourly rate of the team that carries it out.

Finally, define the item for integration with the software supplier and add a buffer for unforeseen costs. Split the finished budget into stages in line with the migration schedule, so that each stage has its own scope and acceptance.

Example calculation

Sample budget for replacing cards in a plant of 800 people

Assumptions
ParameterValue
Number of people800 people
Card reserve10 percent
Price of an encrypted card18 PLN per piece
Personalization time6 minutes per card
Personalization hourly rate120 PLN per hour
Readers with SAM module40 at 1,800 units and PLN per unit
KD configuration and diversification25,000 PLN

Result: Cards PLN 15,840, personalization PLN 10,560, readers PLN 72,000, configuration PLN 25,000: total PLN 123,400 excluding integration.

Note: Sample calculation on the assumptions above, not an offer. Indicative ranges from 2025-2026 deployments; individual quote.

Video

Frequently asked questions

Does InnerWeb include the readers in its quote?

No. InnerWeb is a software manufacturer and does not sell readers. The readers and SAM modules are priced by the access control supplier of the plant.

Can the cards be replaced in stages?

Yes. Readers that support both card types allow cards to be replaced in groups, starting with the critical zones.

How many cards should be bought beyond the number of employees?

The sample calculation assumes a reserve of 10 percent for losses and new employees. Set the exact value based on the history of replacements in your own plant.

Does tidying the register lower the cost of migration?

Yes, because duplicate accounts and cards without a link come to light during a replacement and lengthen personalization. Clearing them up before the migration shortens it.

Sources