InnerWeb
Skip to main content

Vehicles on site register: forgotten driver exits on the night shift

A driver leaves at night, the duty officer is busy with another vehicle and the exit is not recorded, so in the morning the register shows a person who is no longer on site. We collect best practices for a plant working night shifts: rules for recording exits, automatic closing after 12 hours and a check that does not inflate the number of people.

12 h
threshold for automatic closing of a stay without an exit
Source: feature sheet
3 h
frequency of the closing job
Source: feature sheet

Where an overstated count on site comes from

The list of people currently on site is a fact from the register, not an assumption: every scan is saved as a gate entry, including a blocked attempt. This is the register's strength, but it has a consequence: if an exit is not recorded, the person stays on the list until the entry is closed. In a plant with heavy night traffic, where the duty officer handles the gate alone, such omissions happen more often than during the day.

A second scan by a person who is already on site and has a green verdict records the exit. A driver who leaves without a scan leaves an entry without a matching exit. For the head of security this means that in the morning it has to be settled who from the list is really on site and who left long ago.

Automatic closing after 12 hours

A person who has not recorded an exit is closed automatically after a stay longer than 12 hours. The job runs every 3 hours, so in the worst case the entry is closed about 15 hours after the entry. A night shift does not disappear from the list after a few hours of work, and at the same time old entries do not hang around for longer than one day.

With an eight-hour shift the margin is clear: a driver working at night for 8 hours will not be closed during his work, and a forgotten exit disappears from the list within the next closing window. The rule is fixed, so it does not require a decision from the duty officer.

Time until a forgotten exit is closed

Time until a forgotten exit is closedBar chart: an 8-hour night shift, a 12-hour closing threshold and the latest closing after 15 hours.051015hNight shift: 8 h8 hNight shiftClosing threshold: 12 h12 hClosing thresholdLatest closing after: 15 h15 hLatest closing after
Source: Example calculation: 12-hour threshold from the feature sheet, job every 3 hours, eight-hour shift as an assumption

Practices for night duty officers

First, write into the night instructions that a driver leaving the plant always scans the code on the way out, even if the duty officer knows him. Second, at the start of the shift check how many drivers are on the list and compare it with the number of vehicles in the yard. A discrepancy is a signal to complete the entries, not proof that the system is at fault.

Two scans of the same code within 5 seconds are recorded as one event, and a second scan does not reverse the direction of entry or exit. So a driver does not have to worry that an accidental double read will record him again, but the duty officer should wait a few seconds before the next attempt if the first scan was unclear.

Practices for the head of security

Once a week review the entries closed automatically. A large number of such entries in a particular shift shows where the exit procedure is not working. The cause may be a duty officer's break that is too short, a lack of information for drivers, or a scanner placed where the driver cannot see it in the dark.

Make sure the scanner at the exit is lit and has a clear sign with instructions in the languages the drivers speak. This way the exit procedure is just as simple as entry and does not require remembering anything beyond one scan.

Checklist

Video

Frequently asked questions

Will the night shift disappear from the list too early?

No. Closing happens only after a stay longer than 12 hours, so a person working a typical eight-hour shift stays on the list for the whole time of work.

How quickly does the entry of a forgotten exit disappear?

The closing job runs every 3 hours, so in the worst case the entry is closed about 15 hours after the entry.

Will a double scan record the driver twice?

No. Two scans of the same code within 5 seconds are recorded as one event, and the second scan does not reverse the direction of entry or exit.

Let us clean up the register after the night shift

We will show in a demo how the automatic closing of a stay works and how the duty officer sees the list of people on site.

Let's talk