Why parking and evacuation are connected
A guest or supplier driver who parks his vehicle on site is, in an emergency, a separate group: he knows the plant less well than the employees, does not know the exit routes and often wants to go back to the car for his things. If the parking zone is not aligned with the assembly point, the evacuation starts with chaos at the gate.
The evacuation list is built from QR scans at the gate, refreshes every 13 seconds and divides people into six groups: guests, couriers, suppliers, plant employees, external companies and uncertain. It is printed on one page. For drivers this matters especially, because they are the most likely to pass through the gate without a new scan when they return to their vehicle.
Practice 1: parking zones matching the list groups
The simplest rule is to split the parking zones according to the same groups visible on the evacuation list: a separate zone for guests, a separate one for suppliers and couriers, a separate one for external companies. Then the list from the gate matches the layout of the yard, and the person commanding the evacuation knows which vehicles to look for.
If two groups share the same zone, introduce markings on the bays or coloured signs behind the windscreen. It does not have to be an electronic system: a colour matching the group is enough for security to recognise from a distance.
Transmitters along a route to the assembly point (about every 100 m)
Practice 2: assembly point visible from the car park
The assembly point should be signposted so that a driver can see the route to it from the parking spot, without passing through the entry gate. The assessment is simple: stand on each guest parking bay and check whether the assembly point sign is visible.
For drivers from abroad and from outside the plant, the signs should be bilingual or described with a pictogram. A driver's voice navigation works in one of 10 languages, but in an emergency it does not replace signage in the yard.
Practice 3: transmitters along the routes to the assembly point
The position of a vehicle comes from the signals of several BLE transmitters averaged on the map, without GPS. Plant roads are covered with transmitters roughly every 100 m. If the route from the guest parking to the assembly point is 400 m long, you need about four transmitters so that the map shows the vehicle moving rather than standing still.
Plan the placement of transmitters so that they cover both the car park and the route to the assembly point. Then the dispatcher sees on the map that the driver has left the parking zone, and the evacuation list from the gate adds information about the people who did not leave.
Practice 4: an evacuation drill involving drivers
Once a year, during an evacuation drill, rehearse the scenario with guests arriving by car. Prepare a printout of the evacuation list that fits on one page, and check how many people are in the uncertain group. That group is a measure of the register's quality: the fewer people in it, the better entries and exits are scanned.
After the drill record how many minutes it took the drivers to reach the assembly point from the car park and what obstacles occurred. Data collected this way makes it possible to improve the signage without guesswork.
Checklist
Video
Frequently asked questions
Must a driver scan the code when leaving for the assembly point?
In an emergency the priority is reaching the assembly point safely. The exit scan applies to normal departure from the plant, and the evacuation list is based on the last state in the gate register.
How often is the evacuation list refreshed?
Every 13 seconds. As a result the person commanding the evacuation sees the current state, and the printout fits on one page.
What does the uncertain group on the list mean?
These are people whose status on site is not unambiguous. A large number of entries in this group points to inconsistent scanning of entries and exits, and the rules at the gate are worth checking.
Let us align the car park with evacuation
We will show the evacuation list built from QR scans and help you plan parking zones and the assembly point for drivers.
Let's talk