Assembly point frame in a training film: best practices

The final scene of the intro film is the only moment when a guest learns where to go in case of an alarm. If the film shows one assembly point for everyone while the plant has several gates, some people will head in the wrong direction. Below are the frame practices that worked at the packaging manufacturer's plant.

6
groups on the evacuation list, one page per group
5
film versions with their own ending

Why the assembly point is per group

At a plant where employees, guests, truck drivers, couriers and external contractors enter through different gates, the nearest assembly point depends on the gate, not on the role. For this reason the ending of each group's film points to the assembly point next to the gatehouse at the correct gate and asks people to report their presence on site.

A guest who completed the intro training in the version for their group sees in the final frame the place that is actually easiest for them to reach. This reduces the number of people who, during an alarm, look for the right place in unfamiliar terrain.

Practices for the frame

The practices below concern the frame itself, the voiceover and the organization of the ending.

ISO 7010 E007 symbol on the plan

Mark the frame on the site plan with the ISO 7010 E007 symbol, the sign for an emergency assembly point. The symbol is known from signage on site, so a person recognizes it at the gate straight away.

One point per frame

Do not show several points in one frame. The version assigned to a group and gate shows one point, and the other points stay in the versions of other groups.

Ending as a separate block

Keep the ending as a replaceable block of the script. After the head of security's remarks, the assembly point was changed in all five versions by swapping one block.

Request to report presence

The ending finishes with a request to report presence at the assembly point. The group coordinator then has someone to verify the list against.

Link with the evacuation list

The evacuation route and the assembly point are not functions of the system: the assembly point is content of the film and the plant procedure. The system shows the list of people and their last known position. The evacuation list divides people into six groups (guests, couriers, suppliers, plant employees, external contractors, uncertain) and is printed as one page per group, to be handed to group coordinators at the assembly point.

A good practice is to align the group names in the film with the group names on the list. A coordinator who hears "guests" in the film should find the page "guests" on the printout, not some other term.

Checking the frame before publication

The frame is checked together with the head of security: walk the route from the gate to the assembly point and compare it with the frame of the film. A difference between the film and the terrain, for example a different colour of a post or changed greenery, may cause doubt, so it is worth noticing before publication.

After upload to the library, check that each group receives its own version. A corrected file is replaced in the library, and before any catalog edit the system saves a copy of the previous file, so a mistake can be reverted.

Checklist

Video

Frequently asked questions

Does the system indicate the evacuation route?

No. The assembly point is content of the plant's film and procedure. The system shows the list of people and their last known position.

Can one frame show several assembly points?

Better not. The version of the film for a group and gate shows one point, to avoid doubts.

How is the assembly point marked on the plan?

The plant used the ISO 7010 E007 symbol, the sign for an emergency assembly point.