Training film checklist before publication

A mistake in the induction film is seen by every person who enters the plant, so checking before publication costs far less than a fix afterwards. This checklist for the safety manager covers group versions, language, assembly point, CC subtitles, thumbnail and a catalogue copy, with a comment on each point.

Versions and groups: does every group get the right film

Start with a list. For each incoming group, for example employees, visitors, TIR drivers, couriers and external contractors, name the film they must watch. A corrugated cardboard packaging plant built five such versions, and each one has its own ending.

Watch each version separately, from start to finish, not just one of them. A common mistake is fixing the block in the employee version and leaving the old block in the visitor version. Check that the shared blocks are identical and that the group blocks address the right role.

Language and test: is the content and are the questions consistent

For each language version, check that the narrator speaks the declared language and that the subtitles match the text. The training system supports Polish, English, Ukrainian and Russian. A language with no film is switched off in the library with a "coming soon" note, so gaps are visible at once.

Check the test after the film: the questions should be translated 1:1 from the Polish pattern, and the correct answers should sit in the same places or be remapped accordingly. For English, remember that subtitle timing must be recalculated for the new narrator, because the speaking pace differs from the Polish version.

Number of checked elements in one plant induction film

Number of checked elements in one plant induction filmBars: 5 film versions, 4 system languages, 2 files per language.012345pcsFilm versions: 5 pcs5 pcsFilm versionsSystem languages: 4 pcs4 pcsSystem languagesFiles per language (with and without CC): 2 pcs2 pcsFiles per language (with andwithout CC)
Source: Deployment pattern and video library documentation

Assembly point: does the ending match the plant plan

The assembly point is part of the film content and of the plant procedure, not a system function. That is why the safety manager, not the system, is responsible for the ending matching the plan. At the plant in question, the ending of each group's film points to the assembly point next to the gatehouse at the correct gate and asks people to report their presence on site.

Check that the frame is marked on the plant plan with the ISO 7010 E007 symbol, that the gate shown in the film matches the gate through which the group enters, and that the narrator's text does not point to a location that has since changed. After changing the assembly point, all versions must contain the new block.

Files and library: will the film land where it should

Adding a film to the library is a data change on the installation: the catalogue file and the files in the object storage. Check that the catalogue has an entry for every language version and that each language has two files, one with subtitles and one without. The CC subtitle switch appears only when both exist.

The administrator sets the description, thumbnail, title, number, category and order in the browser. Check that the thumbnail is legible and the title is unambiguous for the group. The files are private company material with no public addresses, so run the playback test after logging in.

Before saving changes, make sure a copy of the previous catalogue file exists. The system saves it automatically before every edit, so an incorrect title or category can be reverted.

Acceptance: who approves and what stays as evidence

Approving the film is a decision of the safety manager and the person responsible for security. Keep in the plant documentation the publication date, the list of versions and languages, and the information about the assembly point the film indicates. This gives audit evidence that the film was current for the given period.

InnerWeb does not supply ready-made films, so the approval concerns the plant's own material. After publication, check one full path on the kiosk: language selection, film, test and entry record. Only that confirms the film works where people will actually watch it.

Checklist

Video

Frequently asked questions

Who should approve the film before publication?

The safety manager together with the person responsible for security. The film content, including the assembly point, is the plant's responsibility.

Why is the CC subtitle switch missing?

The switch appears only when the film exists in a given language both with and without subtitles.

Do I need a programmer to change the thumbnail or the order?

No. The administrator changes the description, thumbnail, title, number, category and order in the browser.

What to do after an incorrect catalogue change?

Before every edit the system saves a copy of the previous catalogue file, so the change can be reverted.