Changing the assembly point in the intro safety film

After a round of comments from the security manager, the plant of a packaging manufacturer had to correct the assembly point shown in its intro safety film. The film existed in five versions for five groups, so changing a single frame risked five new productions. The plant replaced one block and swapped it in all versions.

5
film versions corrected by one block
6
groups on the evacuation list

Comments from the security manager

The intro film in five versions was ready for publication in the library when the security manager raised comments on the closing scene. Each group ends the film by pointing to the assembly point next to the gatehouse at the right gate and asking visitors to report their presence on site. The comment was that the frame had to show the location unambiguously, not only describe it in words.

For the plant this was a typical moment of risk. The closing scene is the part a person entering the site remembers best, so an error there has the greatest consequences during an evacuation. At the same time it is the element that changes most often, because the assembly point depends on how traffic is organised on the site.

Solution: swapping one block

Because the closing scene was a separate block of the script, the change was made in all five versions as a swap of that block. The new frame was marked on the site plan with the ISO 7010 E007 symbol, which denotes an emergency assembly point. The rest of the film stayed unchanged, so the shared blocks did not have to be voiced again.

The swap does not end with the video file. After replacing the film in the library, the administrator checks the title, number and order in the catalogue, and before editing the catalogue the system saves a copy of the previous file. This makes it possible to restore the previous version if the new frame turns out to be wrong.

  • Identify the closing block in each of the five versions.
  • Prepare one new frame with the site plan and the E007 symbol.
  • Assemble the five versions from the new block and check each one separately.
  • Replace the file in the library, keeping a copy of the previous catalogue entry.

Number of versions to rework: two approaches (diagram)

Number of versions to rework: two approaches (diagram)Chart: five versions are affected by both approaches, while a block swap changes only the closing scene.012345versionsFilm as a wholeFilm as a whole: 5 versions5Block swapBlock swap: 5 versions5
Source: Sample calculation: both approaches affect five versions, the scope of work differs

What the system shows and what is film content

The evacuation route and the assembly point are not a system function. The assembly point is content of the film and of the plant procedure, while the system shows the list of people and their last known position. The evacuation list divides people into six groups: guests, couriers, suppliers, plant employees, external companies and unknown. One page is printed per group, to be handed to group coordinators at the assembly point.

For this reason a change of assembly point requires parallel changes in three places: the film, the evacuation procedure and the instructions for group coordinators. The system does not check that these three sources agree, so responsibility for consistency lies with the plant.

Check after the change: five versions, one list

After the block was swapped, the coordinator watched each of the five versions from start to finish, because editing errors usually appear at the joins between blocks. Three things were checked: whether the frame with the E007 symbol points to the gate correct for a given group, whether the voiceover finishes its sentence before the scene changes, and whether the request to report presence at the assembly point was kept.

A simple table proved useful: version, gate, frame, presence report, signature of the person checking. The table also served as evidence for the audit that the correction reached all groups, not only the one in which the comment was raised.

The plant also agreed one more rule: after every change in site traffic organisation, for example closing a gate for renovation, the closing scene goes onto the list of items to review within the same week. This keeps the film in line with what happens on site.

Result and conclusions

The result was a correction covering five versions by replacing one block, without refilming the whole films. The plant kept the layout of the library and the order of the films, and users did not have to learn anything new.

The practical conclusion is that the closing scene with the assembly point should be planned from the start as a separate, replaceable block. A second conclusion concerns the control routine: after every change, all language versions and all groups are checked, not only the one that the commenting person watched.

Video

Frequently asked questions

Can the system indicate the assembly point by itself?

No. The assembly point is content of the plant film and procedure. The system shows the list of people and their last known position.

Can an incorrect change in the film catalogue be reverted?

Yes. Before each catalogue edit the system saves a copy of the previous file, so an incorrect title or category can be reverted.

Which sign marks the assembly point?

The plant used the ISO 7010 E007 symbol, which denotes an emergency assembly point, marked on the site plan.