Scenario: an open-air yard and heavy equipment traffic
A scrap yard and a storage yard are areas where loader operators, internal transport drivers and pedestrians work. The logistics director wants to know where each person is, because traffic is dense and visibility is limited by heaps and vehicles.
The challenge is different from a hall. There is no ceiling on which beacons can be hung, and no certainty of power at every point of the yard. The solution has to use what the plant already has, so that the work does not start with building new infrastructure.
Rule: beacons where power is available
Outdoors, beacons are installed only where power is available, that is on building walls and lamp posts, without new poles and cables. In a heavy industry plant, the lamp posts of yards and roads form a ready grid of points with known coordinates and service access.
The InnerWeb industrial radio beacon has an industrial design, a CE declaration and an operating temperature range from -40 to 60 degrees Celsius, and an ATEX version for zones 2 and 22 is available where the zone classification requires it. For a yard in the open air this means operation in winter and summer without climate enclosures.
Beacon points on a sample 300 m by 200 m yard
Density: about every 100 m along the roads
On plant roads beacons are placed about every 100 m. On the storage yard this means a strip along the access roads and the perimeter, followed by points where lamp posts reach into the yard.
Location works without GPS, which is important under overpasses, near buildings and in places where the satellite signal is disturbed. The position is calculated from signals of several beacons averaged on the map, so several lamp posts in range give a more stable result than a single, very strong one.
A phone or watch receives signals from several beacons at once, together with the strength of each one, and sends them every few seconds over the cellular network or Wi-Fi. The cellular coverage of the yard therefore has to be checked in parallel with the beacon layout.
Implementation stages in the scenario
The order of work is arranged so that the yard stays under supervision for as short a time as possible without coverage, and so that no work requires stopping traffic.
- inventory of lamp posts and walls with power, including their numbering and service access
- marking the points on the yard map and identifying sections where the spacing exceeds 100 m
- decision whether a gap is closed with a beacon on a building wall or with an additional lamp post
- installation in service windows, using a lifting platform, outside peak traffic hours
- coverage measurement along vehicle routes and pedestrian paths after installation
- entering the measurement result into the acceptance protocol
Sample calculation: perimeter of the yard and number of points
Assume a rectangular yard of 300 m by 200 m with an access road running all around it. The perimeter is 1,000 m, and at a spacing of 100 m along it, 10 points are needed. These are sample assumptions, not data from a specific plant.
Two access roads leading 150 m into the yard add one intermediate point each, two in total. The whole yard requires 12 beacons, if all points fall on existing lamp posts or walls. Each missing point requires a decision on additional installation.
Conclusions for the logistics director
The greatest value of the scenario is that nothing has to be built: the coverage of the yard relies on existing power, so the cost and time of entry are limited to beacons and installation. What remains is to check whether the lamp posts stand where people actually move.
For the dispatcher the result is a map with people and vehicles on the yard, and for occupational health and safety a list of persons in the zone in case of an incident. The thread of access to the hall and work at height is described in our recommendations and best practices on installation.
Number of beacons on the storage yard
| Parameter | Value |
|---|---|
| Yard dimensions | 300 x 200 m |
| Spacing of beacons on roads | 100 m |
| Roads 150 m into the yard | 2 pcs |
Result: A perimeter of 1,000 m gives 10 points, the roads into the yard add 2, for a total of 12 beacons.
Note: Sample calculation; the figures are assumptions and the locations of the lamp posts require an inventory.
Video
Frequently asked questions
Do outdoor beacons require mains power?
Radio beacons run on industrial batteries for several years. Lamp posts and walls are chosen because they give permanent service access and a mounting point, not because the beacon needs a cable.
What about frost and heat on the yard?
The operating temperature range is from -40 to 60 degrees Celsius, which covers winter and summer conditions in a heavy industry plant.
Will the system work without GPS?
Yes. The position is calculated from the signals of BLE beacons, so the lack of a satellite signal under overpasses or near buildings does not switch off location.
Let us check the lamp posts on your yard
Talk to the InnerWeb team about coverage of yards and plant roads. We will help you count the points based on an inventory of lamp posts.
Let's talk