InnerWeb
Skip to main content

Worker location preview on the map: operator's FAQ

The map operator opens the preview of a single worker and sees a dotted line to the worker's place of work, and for a permit with several locations also an outline. Questions follow: where does this distance come from, why is there no outline, and is this a hazardous zone. We answer them based on how the InnerWeb isometric map works.

5 m
outline margin around the locations
Source: InnerWeb feature documentation
1000 m
threshold for switching from metres to kilometres
Source: InnerWeb feature documentation
< 1.5 m
accuracy in the urban project
Source: InnerWeb facts

What the worker location preview shows

The preview narrows the map down to one person. Instead of a view of all workers, the operator sees the selected person, the place where they are supposed to work, and a dotted line connecting both points. Next to the line the distance appears in metres, and above 1000 m in kilometres.

The person's position comes from signals of many BLE beacons averaged on the map, and inside a building we assume one beacon per 100-200 m2. The system works without GPS and is independent of the client's access control system, which it complements rather than replaces.

Questions about distance and the dotted line

The dotted line is the most frequent point of questions, because it looks like a route, and it is not one.

Does the dotted line show the path the worker has to take?

No. The line connects two points in a straight line and serves for a quick assessment of how far the person is from the target. It does not account for walls, stairs or corridors, so the real route is often longer than the distance shown.

What units is the distance in and how is it calculated?

The distance is calculated in the local metric grid of the hall, not in geographic coordinates. Up to 1000 m the system shows the result in metres, and above that in kilometres. For a production hall metres are usually enough, while kilometres appear for large plant grounds.

Is the distance accurate to the metre?

The position is averaged from many signals, so it is an estimate, not a geodetic measurement. In an urban project with 11,000 beacons we reached an accuracy below 1.5 m, but inside a hall the result depends on the number of beacons and radio conditions, which is why we treat the distance as indicative information for the dispatcher.

Beacon density inside buildings and on roads

Beacon density inside buildings and on roadsBar chart: inside a building one beacon covers 100 to 200 square metres050100150200m2/beaconBuilding, lower value: 100 m2/beacon100Building, lower valueBuilding, upper value: 200 m2/beacon200Building, upper value
Source: InnerWeb facts: inside a building 1 beacon per 100-200 m2

Questions about the work area outline

When a permit covers several locations, the map draws one outline enclosing all the locations on the hall plan, with a 5 m margin. Instead of several scattered points, the operator sees a single work area.

Why is the outline shaped like an ellipse?

Industrial installations usually run in a line: a pipeline, a rack, a conveyor. A circle drawn around such a line would have a radius of half its length and would cover neighbouring jobs that have nothing to do with it. An ellipse follows the direction of the line, so the outline is tighter and easier to read.

Is the outline a hazardous zone under the regulations?

No. The outline is a visualisation of the permit's location on the map, not a designated hazard zone. The classification of zones, for example explosion zones, comes from separate documentation and does not change by drawing an outline.

Why do some permits show only a point?

A permit with one location stays a plain point without an outline, because there is nothing to enclose. An outline appears only from two locations visible on the same hall.

Permit in another hall: why there is no outline

The map shows one hall at a time. If the permit's locations lie in a hall other than the one currently open, they are not drawn on the current plan. The operator then sees no outline and may think the permit is wrong, although it lies outside the view.

The solution is simple: switch the view to the hall where the permit is located. When the locations are spread over two halls, the outline on each plan will cover only the locations that lie on it, and the others appear after the view is changed. For the dispatcher this is a hint that the work covers more than one hall and must be checked on both plans.

Questions about daily use

The preview serves three tasks: checking whether the worker is close to the place of work, assessing the distance before calling someone, and visually checking whether the permit covers the right area. It does not replace a conversation with the worker or the risk assessment on site.

It is also worth deciding who has access to the preview. A person's location is sensitive data and should be visible to the roles that need it for safe work, not to all users of the system.

  • open the preview for a specific person with a specific permit,
  • treat the distance as approximate, as a straight line,
  • for a missing outline, first check by switching the hall,
  • do not equate the outline with a hazard zone.

Checklist

Video

Frequently asked questions

Does the preview work without GPS?

Yes. The position comes from signals of many BLE beacons averaged on the map, so the system works inside buildings where GPS is not available.

What will I see when a permit has locations in two halls?

On each plan you will see only the locations lying in that hall. After switching the view to the second hall, its part of the outline or its point will appear.

Does the dotted line change when the worker moves?

The line connects the person's current position with the place of work, so the distance refreshes together with the position. Accuracy depends on the beacon density at that spot.

Does the preview replace the dispatcher?

No. The preview gives the dispatcher information for assessing the situation, but the decision to call for help or stop work is made by a person.

See the preview on the map of your hall

Book a demo of the InnerWeb isometric map and see how the outline, the distance and a person's preview look on the plan of your plant.

Let's talk