Risks and documents in the location hierarchy: best practices

A risk assigned to a whole hall does not have to be entered on every line, and an instruction assigned to a line should not hang over the whole hall. Good practice comes down to one question: at which level of the hierarchy does a given risk actually apply. Below are the plant structure, the inheritance rules and a checklist of assignments.

5
levels of the plant structure in the map editor
Source: card
24 vs 4
entries with 6 lines and 4 risks: on the lines versus at hall level
Source: example calculation

Plant structure: five levels

The plant structure in the map editor has levels: land plot, view or department (hall), area (building), line and location. A building can have several floors, and lines and locations are assigned to a floor. Each level is a place to which content can be assigned.

Good practice starts from understanding that a higher level covers the lower ones. A document assigned to a hall is visible for the areas and lines below it, while a document assigned to a line does not spill over to neighbouring lines. It is the same principle everyone knows from tidying folders: higher up is more general, lower down more specific.

What to assign at which level

The catalogue of risks and protective measures can be assigned to a location at any level of the plant hierarchy (hall, area, line, place) and to a type of hazardous work. The worker sees them before starting work. Documents, audio and video recordings can be assigned to a hall, area or line and read at lower levels, because the assignment is inherited down the tree.

A practical rule: the broader the content, the higher the level. General rules for moving forklifts, a zone where safety glasses are always required, the hall evacuation instruction: these are hall-level items. Hazards linked to a specific machine, for example a press or a dryer: line or place level.

Hall level

This is where risks and documents common to the whole room belong: vehicle traffic, evacuation rules, general personal protective equipment, the introductory film. They pass down to all areas and lines.

Line and place level

This is where hazards resulting from a specific machine and workstation instructions belong. In this way a worker on a line sees both the hall risks inherited from above and their own, while a worker on the neighbouring line does not receive messages that are not meant for them.

Number of entries to maintain: 6 lines, 4 shared risks

Number of entries to maintain: 6 lines, 4 shared risksComparison: 24 entries when assigned on the lines, 4 entries when assigned at hall level0510152025entriesAssignment on every line: Entries to maintain: 24 entries24Assignment on every lineAssignment at hall level: Entries to maintain: 4 entries4Assignment at hall level
Source: Example calculation: 6 lines x 4 risks = 24 entries; 4 entries at hall level

How to avoid duplication

The most common mistake is copying the same risk to every line. This costs twice: every change of content requires correcting many entries, and sooner or later one stale copy is left behind. Assigning higher up in the tree solves both problems, because a change in one place reaches all the levels below.

An example illustrates the scale. A hall with 6 lines and 4 shared risks, entered separately on each line, gives 24 entries to maintain. The same risks assigned at hall level give 4 entries. Both numbers follow from the assumptions of the example, not from a measurement at a specific plant.

Exceptions: when to assign lower than it seems

Some content we deliberately narrow. If a risk concerns only one line, and entering it at hall level would show it to workers it does not concern, they will quickly learn to ignore it. A message that appears everywhere stops being a message.

The second exception is different versions of the same instruction for different areas. Then the general instruction stays at hall level and the specific versions sit on the lines, so that the worker sees both in the right order. When the hierarchy changes (a new line, a moved machine), check that the assignments still match reality.

Example calculation

Example calculation: how many entries to maintain

Assumptions
ParameterValue
Number of lines in the hall6 lines
Risks shared by the whole hall4 risks

Result: On the lines: 6 x 4 = 24 entries. At hall level: 4 entries, that is six times fewer.

Note: Example calculation based on assumptions, not a measurement from a plant.

Checklist

Video

Frequently asked questions

Is a hall document visible on a line?

Yes. Documents, audio and video recordings assigned to a hall, area or line can be read at lower levels, because the assignment is inherited down the tree.

Can a risk be assigned to a type of work?

Yes. The catalogue of risks and protective measures can be assigned both to a location and to a type of hazardous work.

Can a building have several floors?

Yes. A building can have several floors, and lines and locations are assigned to a floor.