The situation: one permit, several workstations
In an assembly hall for agricultural machinery, repair work rarely concerns a single point. A typical permit covers a line: several workstations along a production line, a section of compressed air piping or a row of racks. A dispatcher who sees one dot on the map does not know whether the work concerns one workstation or five.
This is a scenario prepared for a plant of type M, meaning an agricultural machinery plant belonging to a global group, at the offer and demonstration stage. We describe how this plant could use a function the system already has. We do not claim that a rollout has been carried out.
The starting point is an isometric map of the hall with transmitters, and permits created from templates. The plant hierarchy allows a permit to be assigned several locations within one hall, and the system draws a shared outline from them.
How the outline is created
A permit covering several locations is drawn on the map as one outline enclosing all its locations on the hall plan, with a 5 m margin. The outline has the shape of an ellipse, because industrial installations run in a line: a circumscribed circle around such a line would have a radius of half its length and would cover neighbouring work that has nothing to do with the permit.
A numerical example illustrates the difference. For a line of workstations 40 m long, the circumscribed circle has a radius of 20 m, so a diameter of 40 m in every direction. An ellipse fitted to the line keeps the length of 40 m along the line, and across it can be narrow. This is a geometric example, not a measurement from a plant.
What the outline means and what it does not
The work area outline on the map is a visualisation of the permit location, not a hazardous zone in the sense of the regulations. The boundary of an explosion hazard zone is set by the plant documentation, not by a drawing on the map. The dispatcher uses the outline for orientation: where the work is and who is nearby.
Circle versus ellipse for a 40 m line: outline length along the axes
- Circumscribed circle
- Ellipse (assumption: minor axis 10 m)
Worker location preview
The second function is the worker location preview. It narrows the map to one person, draws a dotted line to the place where that person works, and shows the distance in metres, and above 1000 m in kilometres. The distance is calculated in the local metric grid of the hall.
The worker position comes from signals of several BLE transmitters averaged on the map. The system is an independent supplement to the plant's existing systems: in a building one transmitter is placed per 100 to 200 m2 and it works without GPS. For a hall this means that accuracy depends on the density of transmitters, not on satellite coverage.
- Dotted line from the worker to the permit outline
- Distance in metres, above 1000 m in kilometres
- Map narrowed to one person
- No GPS: position from several transmitters
Limitations the dispatcher must know
The map shows one hall at a time, so permit locations lying in another hall are not drawn. If a permit covers workstations in two halls, the dispatcher sees the outline only in the hall that is open and must switch the view to see the second part.
A permit with one location on the map remains an ordinary point without an outline. This is not an error: an outline is created only from two or more locations. When designing templates, it is therefore worth deciding whether work on a single machine is described by one location or by several points.
When a permit is created, the system also checks whether the assigned workers hold the required, valid qualifications, and warns about qualifications that are about to expire. The outline on the map and the qualification check therefore work together: the dispatcher sees where the work takes place, and the system checks who performs it.
What the plant should settle at the demonstration stage
Before a demonstration in the hall, three things are worth agreeing: which halls and areas are in scope, in what structure the locations are recorded (workstation, line or area), and which dispatchers will use the map day to day. Without these decisions the outline will be technically correct but of little use.
The demonstration is best based on a real permit from the last few weeks. We recreate it in the system, assign four or five locations and check whether the outline matches what the dispatcher remembers from the hall. If it does not, the cause is usually the granularity of the location description, not the map itself.
Example calculation: area of a circle versus an ellipse
| Parameter | Value |
|---|---|
| Length of the workstation line | 40 m |
| Minor axis of the ellipse (assumption) | 10 m |
Result: A circle with a diameter of 40 m has an area of about 1257 m2, while an ellipse with axes of 40 m and 10 m has about 314 m2, that is four times less.
Note: Example calculation based on illustrative assumptions, not a measurement from a plant.
Video
Frequently asked questions
Is the work area outline an Ex zone?
No. It is a visualisation of the permit location on the map. The explosion hazard zone is set by the plant documentation.
What if the permit covers two halls?
The map shows one hall at a time, so the outline is visible in the open hall, and the second part after switching the view.
Does one location also give an outline?
No. A permit with one location on the map remains an ordinary point.
Is GPS required?
No. The position comes from signals of several BLE transmitters averaged on the map, and the system works without GPS.
See the outline on your hall
Book a demonstration on the plan of your hall. We will recreate a real permit covering several workstations and check whether the outline matches what the dispatcher knows from the floor.