The problem of a single point
When a permit covers several valves spread along a section of pipeline, a single point shows only one of them. The dispatcher sees the permit in one place, while the workers are working in several. The discrepancy leads to mistakes during inspections and during an incident.
The online map solves this by drawing a single outline.
How the outline is created
A permit covering many locations is drawn as one outline: an ellipse with a 5 m margin around the points. The coordinator indicates the locations, and the system calculates a shape that encloses all of them, enlarged by the margin.
The permit layer filters data along the chain location, line, area, hall, so the outline is visible in the view of the right hall and not across the whole plant at once.
Work extent: point versus outline
What the outline is not
The outline is a visualisation of the permit location, not a hazardous zone in the meaning of the law. It does not replace the risk assessment or a decision to designate a zone, and it must not be presented that way to management or to an inspector.
The 5 m margin is a parameter of the drawing. It does not mean a safe distance and does not change the requirements that follow from the plant's procedures.
Step-by-step practice for the coordinator
First select the right hall on the map, because the map shows one hall at a time. Indicate all work locations from the permit and check whether the outline encloses them together. If the ellipse extends beyond the object, make sure the points do not come from different halls.
Then turn on the preview of the employee doing the work: the map narrows the view to that person and draws a dotted line to the place of work, giving the distance in metres. This gives a quick confirmation that someone is where the permit indicates.
Example: a permit for six valves
The coordinator issues a permit for the inspection of six valves on a section of pipeline. Instead of six separate points, which are hard to link with one document, the map shows one outline. The dispatcher immediately sees that the six places belong to one job.
When another valve is added to the job, its location is included and the outline extends to cover it. Nothing has to be drawn again, because the outline follows from the permit points.
The outline in the dispatcher's work
During an incident the dispatcher should be able to assess at a glance which permits touch a given place. The outline helps here, because it shows the extent of the work and not just a single point, so an overlap of two jobs nearby is visible immediately.
We remind you, however, that safety is decided by procedures and risk assessment, while the map provides evidence of location for an audit and supports coordination.
Most common mistakes
The first mistake is treating the outline as a zone closed to traffic. The second is combining locations from different halls into one permit, which produces an outline stretched across the plant. The third is failing to update the locations after the scope of the work has been extended.
You can avoid them by setting a short rule at the plant: the outline is checked together with the content of the permit whenever a work place is accepted.
Video
Frequently asked questions
Does the outline replace the designation of a zone?
No, it is purely a visualisation of the permit location.
Where does the 5 m margin come from?
The margin is a parameter of the drawing that surrounds the points; it does not mean a safe distance.
Is the outline visible across the whole plant?
The map shows one hall at a time, so the outline is visible in the view of the right hall.