InnerWeb
Skip to main content

Dispatcher checklist: employee preview on the map

During an incident the dispatcher has no time to search for features. This checklist guides them step by step from identifying the person, through the floor, to the distance from the place of work, based on what the online map actually shows.

When to use the employee preview

The employee preview serves to answer quickly the question: where is this person and how far are they from the place where they should be working. It narrows the map to one person, draws a dotted line to their place of work and gives the distance in metres calculated in the local grid of the hall.

It is used during an incident, but also during routine inspections, when a permit indicates a place and it has to be confirmed that the contractor is where they should be.

Order of actions

First select the right hall, because the map shows one hall at a time. Find the employee in the list or on the map and open their preview. A double-click on the employee opens their building at the floor where they are, and the floor follows from their location, line or area.

Then read the distance to the place of work and compare it with the permit outline. If the job covers several locations, the outline shows the extent, not a single point.

Steps of the dispatcher checklist

Steps of the dispatcher checklistDistribution of 10 checklist steps across four groups0123stepsChoosing the hall and personChoosing the hall and person: 3 steps3Floor and buildingFloor and building: 2 steps2Distance and outlineDistance and outline: 3 steps3Confirmation and recordConfirmation and record: 2 steps2
Source: Number of checklist points on this page in four groups

Limitations the dispatcher must remember

The employee position results from periodic signals from their BLE device and is averaged across the signals of several transmitters. This means the position has a delay resulting from the signal cycle, and in places with sparse transmitter coverage it is less accurate.

The distance is calculated in the local grid of the hall, so it refers to that hall and not to the route that has to be walked. The dispatcher should treat it as an indicative measure and confirm it by radio.

After the incident

After the incident ends, record which steps of the list were needed and what was missing. Pass the remarks to the project manager, because they often concern transmitter density or building names.

Regular practice of the list at the workstation shortens the response time more than the best documentation, which nobody opens during an incident.

Comment on the steps of the list

The step most often skipped is checking the floor. The dispatcher sees the building and assumes they have found the person, but the person is one floor up or down. A double-click on the employee solves this, because it opens the building at the right floor, so this step must always be performed.

The second important step is comparing with the permit outline. If the person is outside the outline while the permit indicates work on a pipeline run, the cause has to be established: a break, a change of place or a signal problem.

How to put the list into use at the workstation

Print the list in A5 format and place it at the dispatcher's workstation, and practise it on a simulated incident in the training system. Two or three exercises per quarter are enough for the steps to become a habit.

After each exercise compare the time from the report to the confirmation of the position by radio. A reduction in this time is the best measure of whether the list works.

Checklist

Video

Frequently asked questions

Does the preview show the floor?

Yes, a double-click on the employee opens the building at the floor where they are.

Is the distance the route to walk?

No, it is calculated in the local grid of the hall and is indicative.

Why does the position sometimes lag?

The position changes according to the periodic signals of the device, so there is a natural delay.

Does the preview work without GPS?

Yes, location works without GPS.

Let us talk about the map of your plant

We will arrange a short presentation of the isometric map on a sample plant and go through the data that has to be collected in your case.

Let's talk