InnerWeb
Skip to main content

Concept: a digital plant map of many buildings and departments

A large multi-building plant has one problem that the map must solve from the start: the security dispatcher hears the name of a place and has to find it within seconds. This concept describes how to arrange departments, buildings and floors on one digital plant map for a refinery-type site. It is a planning model, not a description of a completed rollout.

16
zoom level from which building names are visible
Source: card
12
floor buttons visible at the same time in the selector
Source: card
18
InnerWeb modules using one shared map
Source: card

The dispatcher's problem in a multi-building plant

At a refinery-type plant a report usually sounds like this: "department, building, level". The security dispatcher has to turn that phrase into a point on the map. If the names of buildings and departments are scattered across different documents, every report starts with searching instead of reacting. A digital plant map is meant to shorten that step, because the name, the outline and the level sit in one place.

The concept assumes that the plant structure is drawn once, in the 3D map editor: the buildings, the number of floors and what stands inside. Security and the permit flow then draw on the same data, so the map is not a separate drawing for a poster but a shared basis for several tasks. A plant plan understood this way becomes the source of truth about locations.

Large-facility model: a department as an organisational division

The editor distinguishes two models of structure. In the large-facility model a hall is a view or a department, an area is a building, and a line is a floor. A refinery with many installations and buildings fits this model: the department corresponds to the organisation, and the building corresponds to a specific physical object.

An important detail: in the large-facility model a hall is a level of organisational division, not a physical object, so it has no solid. A department therefore does not hide the buildings. In addition, a department can have its own colour, and in this model it is drawn only as an outline, without a fill, so that it does not cover the objects standing inside.

An example layout of three levels

For the concept, let us assume three levels: the department (a view, for example process installations), the building (an area with a solid) and the floor (a line). A dispatcher who receives the report "department, building, level 2" follows the same path on the map: zooms in on the department, selects the building and switches the floor.

Floor selector

The floor selector appears only when the selected building has at least two floors. Its buttons are labelled P, 1, 2 in the Polish version. Above 12 floors the selector shows a window of 12 buttons with up and down arrows, and scrolling is also possible with the mouse wheel or a trackpad. For a plant with tall process buildings this is a practical convenience.

Layout correspondence: department, building, floor

Layout correspondence: department, building, floorHorizontal bar chart showing three levels of the structure: the department first, the building second and the floor third.0123levelHall (department)Hall (department): 1 level1Area (building)Area (building): 2 level2Line (floor)Line (floor): 3 level3
Source: Three-level layout of the large-facility model according to the map editor documentation

How the map links a click to the right area

A click on a solid is matched to an area by its identifier, and when there is none, by whose outline contains the centre of the solid. Buildings take precedence over organisational areas, and among equal candidates the tightest outline wins. This means that a click on a building located on the grounds of a department opens the building, not the whole department.

A name on the map is assigned only to an area that has an outline and a height, that is, to an object with a solid that can be entered with a double-click. Building names appear from zoom level 16, and at a lower zoom only the names of views, that is, departments, are visible. The dispatcher therefore sees the departments first and the buildings only after zooming in. This staging keeps the map from being flooded with labels.

  • below zoom level 16: department names
  • from zoom level 16: building names
  • inside a building: names always visible
  • a name is given to an area with an outline and a height

Setting up the map step by step

The security team starts with a list of departments and buildings at the plant, with the number of floors for each. Every department gets a colour that no neighbouring department uses. Next, the buildings are drawn as areas with an outline and a height, and the floors as lines. Once the structure is ready, the online map links it with the solids from the file, which we describe in a separate page about linking building solids with a GeoJSON file.

The consistency rule makes checking easy: one area is exactly one solid on the online map. If the list of buildings at the plant has 40 items, the map should show 40 solids with names. Any discrepancy is visible at once and points to the buildings that need to be clarified.

What the concept gives security and management

For security the map shortens the time needed to find the location of an incident, and for management it gives a clear picture of the plant's structure, which is not visible in spreadsheets. The plant map is the common basis for the permit, security and location modules, so the same work at the start serves several needs. InnerWeb has 18 modules and is an independent system that complements the client's existing systems, such as access control, time and attendance, HR and ERP.

It is worth testing the concept on one department before covering the whole plant. Choosing a department with several buildings and different floors makes it possible to test the naming, colours and floor selector on a real plan, and then to extend the map to further departments.

Video

Frequently asked questions

Does a department have a solid on the map?

No. In a large-facility plant a department is an organisational division and is drawn only as an outline, without a fill, so that it does not cover the buildings.

From which zoom level are building names visible?

From level 16. At a lower zoom only the names of views, that is, departments, are visible, and inside a building the names are always visible.

What if a building has more than 12 floors?

The selector shows a window of 12 buttons with up and down arrows. Scrolling is also possible with the mouse wheel or a trackpad.

Is this a description of a refinery that has been deployed?

No. It is a concept for a refinery-type plant, which the team verifies on the plan of the specific facility.

Let us lay out your plant on the map

We will show how to reproduce departments, buildings and floors in the map editor. Book a conversation about the concept for your plant.

Let's talk