Why check at the point of issue
Most faults only come out at the moment of an alarm, and then it is too late. Issuing the watch is the only moment in the day when someone has the device in hand and can check that it will work. Checking before the shift costs a minute, while repairing after an event usually fails.
The employee device periodically sends the beacons it hears, signal strength, battery status and state. From the same heartbeat the foreman can read the state of the watch in the panel, instead of checking it by eye.
Battery and connectivity
The first point is the battery. A watch with a low charge should not go out on shift, because the low battery alarm is one of the typical device events and will raise a report within the first hour. The second point is connectivity: a heartbeat from the last few minutes in the panel confirms that the watch sees the beacons and the server.
If the watch does not respond, check the device log. It is sent every third heartbeat cycle, about every 78 s at a 26 s interval, in batches of up to 89 entries, so the absence of fresh entries a few minutes after pairing is a sign that something is wrong.
Times the employee should know, in seconds
SOS and the template in the location
The SOS alarm is raised by a gesture on the watch button, a triple click or a long press, and it has a three-second countdown in which it can be cancelled. The employee should know the gesture and rehearse it once at the issue point, ideally with cancellation, so that no real call is triggered.
From the watch face the button works through the companion app, which is started after the button is remapped in the device management system, because the face itself does not read the button. At issue make sure the watch is on the app screen and not on another face.
SOS always creates its own permit from a template called SOS. Without such a template in the location the alarm triggers, but no permit is created, so the site loses the trace of the event. It is worth checking the template once at the start of the deployment and after every change to the location structure.
Stillness and rest
Tell the employee that the watch vibrates after 120 s without movement and that the vibration must be confirmed by moving or by a gesture. The stillness alarm does not vibrate while charging or at rest, so a watch put on the charger will not disturb work. After 233 s without confirmation from the server the watch switches to a short pulse every 34 s.
Checklist
Video
Frequently asked questions
Should SOS be rehearsed at the issue point?
Yes, but with cancellation during the three-second countdown, so that no real call is triggered.
What if the watch does not show a fresh heartbeat?
Do not issue it for the shift. Check the device log and the connectivity, and if needed issue a spare watch.
Who checks the SOS template in the location?
The system administrator once at deployment and after changes to the location structure. The foreman only verifies that the employee is in a location with the template.
Let's prepare the issue card for your shift
We will match the list to your devices, templates and locations, and rehearse it with the foremen and security.
Let's talk