Calibrating transmitter power in a dusty hall

In a hall with dust and steel racking, the transmission power of the transmitters must be matched to the specific layout. A well-run calibration reduces crosstalk and extends battery operation, while a poorly done one spoils the position across the whole hall.

25-50
transmitters for a 5,000 m² hall as a starting point
Source: sample calculation
1 per 100-200 m²
recommended density in a building
Source: project card

Why transmission power requires calibration

Calibrating the transmission power to the hall reduces crosstalk and extends battery operation. Battery life is planned after power calibration, not according to factory settings. For the integrator this is the first step of network acceptance, not an add-on after launch.

Transmitter coverage is calibrated at the start of the deployment, before alarms are launched. An alarm based on a position that has not yet been verified gives false results and quickly lowers employees' trust in the system.

Practice 1: start with the hall plan and the layout

Collect the plan of the hall with the racking, machines, partitions and roads. Dust, steel racking and machines change signal propagation, so the same transmitter spacing can give different results in different parts of the hall. Mark on the plan the places where position is critical.

Assume a starting point of 1 transmitter per 100-200 m². For a 5,000 m² hall this is 25-50 units. The sample calculation only sets the number from which you start measurements; the final number is set by the test walk.

Number of transmitters for a hall (1 per 100-200 m²)

Number of transmitters for a hall (1 per 100-200 m²)Bar chart: number of transmitters for halls of 2,000, 5,000 and 10,000 m² at a density of 1 per 100 m² and 1 per 200 m².020406080100units1 per 100 m² (2,000 m²): 20 units20 units1 per 200 m² (2,000 m²): 10 units10 units2,000 m²1 per 100 m² (5,000 m²): 50 units50 units1 per 200 m² (5,000 m²): 25 units25 units5,000 m²1 per 100 m² (10,000 m²): 100 units100 units1 per 200 m² (10,000 m²): 50 units50 units10,000 m²
  • 1 per 100 m²
  • 1 per 200 m²
Source: Sample calculation based on the assumptions in the page text; not an offer, individual quotation applies.

Practice 2 and 3: position from several transmitters, not from the strongest

The position results from the signals of several transmitters averaged on the map, not from the strongest transmitter. When setting the power, do not aim for one transmitter to be audible across the whole hall. The goal is a situation in which, at every point, the phone hears several transmitters with varying strength.

The phone receives the signals of several transmitters at once, together with the strength of each one, and sends them over the cellular network or Wi-Fi every few seconds. Power that is too high causes signals from neighbouring zones to mix and the position to jump; power that is too low leaves points with one transmitter or none at all.

Practice 4 and 5: measurement and cleaning of readings

The BLE scanner in a phone can repeat frozen signal readings. Clean the measurement by rejecting a reading whose signal strength has not changed. During calibration, take measurements with several phones and in different directions, because the human body and the phone casing also affect the reading.

Carry out a test walk along the walls, next to the racking and near the machines. Record the places where the position deviates from the real one by more than the required accuracy allows, and treat them as candidates for an additional transmitter or a change of power.

Practice 6 and 7: batteries, documentation, repetition after changes

After calibration, set the battery replacement plan, because battery operation time is not given as a guarantee. Monitoring of correct operation makes it possible to identify transmitters for replacement in advance, not after the signal has disappeared from the map.

Record the power settings per zone together with the date of the measurements. Calibration is repeated after a change in the layout: new racking, moved machines, extension of the hall. Dust settling on the casings does not change the principle, but it is worth including in the inspection schedule.

Example calculation

Number of transmitters for a 5,000 m² hall

Assumptions
ParameterValue
Hall area5,000 m²
Recommended density100-200 m² per transmitter

Result: 25-50 transmitters as the starting point for calibration

Note: Sample calculation based on the assumptions in the page text; not an offer, individual quotation applies.

Checklist

Video

Frequently asked questions

Why is the transmitter power calibrated?

Calibration reduces crosstalk between zones and extends battery operation. Without it the position is often unstable and the battery life shorter than planned.

When is calibration carried out in a project?

At the start of the deployment, before alarms are launched, so that alarms rely on a verified position.

Does the strongest transmitter determine the position?

No. The position results from the signals of several transmitters averaged on the map, so having several transmitters at a point matters more than one strong signal.