BLE transmitter placement on plant roads: a guide

BLE transmitters on plant roads are installed roughly every 100 m, so that at every point of the road the locator receives signals from several of them. The position of a vehicle or a pedestrian is then the average of many readings on the map, and no GPS is required. This guide takes the traffic maintenance engineer from a road sketch through to the check after installation.

100 m
approximate spacing of transmitters on plant roads
Source: karta
100-200 m2
floor area per transmitter inside a building
Source: karta

The principle: position from many signals, not one

The position of an employee and a vehicle comes from the signals of several BLE transmitters, averaged on the map, and works without GPS. That is why we do not look for one perfect place for a transmitter. We look for a layout in which, at any point of the road, the locator receives signals from at least several of them. A single distant signal is just noise, and the system does not use it on its own.

On plant roads we assume a spacing of about 100 m. Inside buildings, for comparison, one transmitter is placed per 100 to 200 m2. The road spacing is larger because there are fewer obstacles outdoors, and the accuracy needed for navigation and vehicle tracking is different from that inside a hall, where a person is located at a workstation.

Step 1: a sketch of the roads and decision points

Start with the plant map: roads, junctions, gates, weighbridges, ramps and car parks. Mark the points where a driver has to make a decision, because these points determine where transmitters go on the approaches.

A junction is a geometric point and does not require a transmitter in its middle. The message is triggered by transmitters on the approach, whose signal carries tens of metres, so one transmitter on each arm of the junction at a suitable distance is enough. This way you do not interfere with the traffic lane itself.

Example number of transmitters on a stretch of plant road

Example number of transmitters on a stretch of plant roadBar chart: at a 100 m spacing a 500 m road needs 5 transmitters, 1000 m needs 10, 2000 m needs 20.05101520pcsRoad 500 mRoad 500 m: 5 pcs5Road 1000 mRoad 1000 m: 10 pcs10Road 2000 mRoad 2000 m: 20 pcs20
Source: Example calculation: road length divided by the 100 m spacing

Step 2: two readings and the distance from the junction

A junction message is triggered by a transmitter on the approach that is confirmed in two consecutive location readings. This leads to a practical requirement: the transmitter must stand far enough before the junction for a vehicle driving at typical design speed to register two readings, and for the message to arrive before the junction is passed.

Special points, for example a weighbridge or a tight spot at the gate, respond after the first signal. There the transmitter is placed closer, because reaction speed matters, and the risk of a false trigger is acceptable.

If a vehicle must also be located for route analysis, the transmitters must cover the whole road and not only the approaches to junctions. The delivery route follows from the BLE transmitters detected by the locator, not from GPS, so a gap in coverage means a gap in the route.

  • a transmitter on every approach to a decision junction
  • a distance chosen so that a vehicle registers two readings before the junction
  • a closer transmitter at a special point
  • coverage of the whole road where a delivery route is needed

Step 3: mounting and service access

Transmitters are mounted on poles, canopies and building walls along the road. The InnerWeb industrial beacon has an industrial design, a CE declaration and an ATEX version for zones 2 and 22, so it can also stand where explosion-protection requirements apply. At each location, check the power supply or the way the battery is replaced, and access that does not require stopping traffic.

For each transmitter, record its position on the map in the administration tool. A mismatch between the actual and the recorded position spoils the averaging, so after installation it is worth driving a control run and comparing the locator position with the real position at several points.

Acceptance evidence: the control run

For acceptance, a control run of the whole road with the locator is sufficient. You check whether the route is continuous, whether there are no gaps, and whether the junction messages play once, in the right place. The result is recorded in a protocol with a route map.

Only after this test is the decision matrix set on the final transmitters. A change to the matrix does not require a deployment, so corrections after the tests are quick, and moving a transmitter is the only physical activity.

Video

Frequently asked questions

Do I need GPS to locate a vehicle on the road?

No. The position comes from the signals of several BLE transmitters averaged on the map.

Where exactly should a transmitter stand at a junction?

On the approach, not in the middle of the junction. The signal carries tens of metres, and the message is confirmed by two readings.

Can beacons be mounted in explosion-risk zones?

The InnerWeb beacon has an ATEX version for zones 2 and 22. The choice for a specific zone is confirmed with the plant documentation.

Let us plan the transmitters on your roads

Send us the plant plan and we will show what a layout of transmitters on your internal roads would look like.