Intersection Matrix in Voice Navigation: Implementation Notes

Voice navigation in a plant does not calculate routes live: it relies on a matrix in which the administrator has described what to say at which intersection for a given warehouse. We set out implementation notes: the order of building the matrix, choosing the triggering transmitters, rules for empty cells and testing the route to every warehouse.

2
consecutive readings that confirm a prompt
Source: feature card
approx. 100 m
spacing of transmitters on plant roads
Source: company facts

What the matrix is and what it does not do

Navigation rests on an editable decision matrix: what to say at which intersection for a given warehouse. There is no live routing and no hard-coded routes. The system does not search for the shortest path; it reproduces the decisions that the administrator has recorded.

The consequence for implementation is important: the quality of navigation is the quality of the matrix. A plant that knows its roads gets a good matrix within a few days, while a plant with undocumented traffic must first collect that knowledge.

Step 1: list the intersections and directions

Start from the plant plan and mark the intersections where a driver makes a decision. For each one, record the absolute direction of the arms. The system calculates 'left' or 'right' from the actual approach segment relative to the recorded absolute direction, so the data must match the geometry.

An intersection is a geometric point and does not need a transmitter in its centre. Transmitters are placed on plant roads about every 100 m, and the prompt is triggered by those on the approach, whose signal carries tens of metres.

Example number of test runs for a plant with 4 warehouses and 2 gates

Example number of test runs for a plant with 4 warehouses and 2 gatesBar chart: two test runs per warehouse, one from each of the two gates.012runsWarehouse A: 2 runs2 runsWarehouse AWarehouse B: 2 runs2 runsWarehouse BWarehouse C: 2 runs2 runsWarehouse CWarehouse D: 2 runs2 runsWarehouse D
Source: Example calculation: one run from each gate to each warehouse

Step 2: choose the triggering transmitters

For each intersection, select the transmitters on the approach that should trigger the prompt. The trigger condition is cautious: a prompt requires confirmation in two consecutive location readings, and a single distant signal is rejected.

Choose transmitters that the driver passes just before the intersection, not ones that are visible from afar from several arms. This way the prompt arrives at the right moment.

When an empty cell is acceptable

An empty cell means that for a given warehouse at a given intersection the system says nothing. It is justified where the road leads in only one direction or where the decision is obvious and a prompt would be noise.

Each intersection speaks at most once during a single delivery, so unnecessary prompts take the place of important ones. When the system cannot establish which side the driver approached from, it stays silent and records this in the log. Such entries indicate that the transmitters or the geometry at that spot need correcting.

Example split of matrix cells after tuning

Example split of matrix cells after tuningPie chart: 60 cells with a prompt, 30 empty by design, 10 special points.With a prompt: 60 cells (60%)Empty (by design): 30 cells (30%)Special points: 10 cells (10%)100cellsWith a prompt60 cells (60%)Empty (by design)30 cells (30%)Special points10 cells (10%)
Source: Example calculation: assumed split of 100 cells

Special points: weighbridge and tight spots

A special point, for example a weighbridge or a tight spot at the gate, speaks already after the first signal, without double confirmation. Use them sparingly: where a late prompt would cause an error that cannot be undone.

Do not add ordinary intersections as special points, because a single signal can be unreliable. Too many such points will produce prompts at the wrong moment.

Testing the route to every warehouse

After building the matrix, drive the route to each warehouse with a locator and listen to the prompts. Check the approach from every entry gate, because the direction of the arms depends on the side of approach.

A change in the matrix works without deployment and without a restart, so corrections are made straight away in the panel and then tested again. Record the test result for each warehouse, so that the next change to the roads shows what to check.

Maintaining the matrix after deployment

Plant roads change: a new warehouse, a closed section, a change to traffic flow. Each such change requires a review of the matrix, and because editing requires no deployment, it can be made the same day.

Review the logs in which the system recorded silence because the approach side could not be established. Repeated entries at the same spot are the best list of fixes: a transmitter to add or a direction to correct. Assign a person responsible for the matrix and record each change together with the test date.

Video

Frequently asked questions

Does changing the matrix require a restart?

No. The administrator edits the matrix in the panel, and the change works without deployment and without a restart.

Must a transmitter be placed in the middle of an intersection?

No. The prompt is triggered by transmitters on the approach, confirmed in two consecutive readings.

What does the system do when it does not know the approach side?

It stays silent and records this in the log, because a wrong direction is worse than no prompt.