Why the number of beacons changes the bill
The maintenance fee is charged per unit, so the number of beacons translates directly into the annual cost. The multiplier is simple, but the figure in the tender is often vague: the buyer writes about area and floors, while the supplier counts beacons according to the placement rules. The difference between the variants can exceed several dozen percent.
Placement rules from which the number follows
Position results from signals from many beacons averaged on the map. Plant roads are covered with beacons roughly every 100 m, and inside buildings the assumption is 1 beacon per 100-200 m2. The system works without GPS, so inside buildings and under roofs the density of the grid decides the quality of the readings.
For a building with several floors, the area of every floor counts, not only the footprint of the building. A five-storey building with a footprint of 1,000 m2 gives 5,000 m2 of area to cover, which is 25 to 50 beacons in the 1 per 100-200 m2 range.
Number of beacons in two variants
Stage 1 and full grid: what separates the two variants
Stage 1 covers the most important zones and traffic routes, while the full grid covers the entire building with all floors. Stage 1 does not close the way to expansion: beacons are battery powered, so adding more does not require routing power cables or stopping operations.
In the sample calculation stage 1 is 2,250 beacons and the full grid is 4,012. The difference is 1,762 units, which means the full variant has 78% more beacons. If the buyer chooses stages, it should plan the budget for both levels already in the first request.
How to calculate the annual cost step by step
The method has four steps. First, sum the areas by floor and by plant roads. Then divide the area of the buildings by 100-200 m2 and the length of the roads by 100 m. Next, multiply the total number of units by PLN 5 and by 12 months. Finally, record the assumptions in the request, so the supplier can confirm or correct them.
The rate of PLN 5 per unit per month comes from the offer document and is indicative (indicative ranges from 2025-2026 deployments; individual pricing). It is also worth asking whether the fee includes battery replacement, because this element changes the total cost of ownership.
- Stage 1 variant: 2,250 units x PLN 5 x 12 months = PLN 135,000.
- Full grid variant: 4,012 units x PLN 5 x 12 months = PLN 240,720.
- Annual difference: PLN 105,720.
Annual maintenance cost
What to put in the request so both variants are comparable
Ask for two quotes in one template: stage 1 with a list of covered zones, and the full grid. Add floor plans and a list of plant roads. Require the number of units, the fee per unit and the date by which expansion to the full grid is possible without changing the unit price.
The InnerWeb industrial beacon has an industrial design, a CE declaration and ATEX execution for zones 2/22, which matters if part of the building lies in an explosion hazard zone. In that case mark those zones separately in the request.
Maintenance of the beacon grid in two variants
| Parameter | Value |
|---|---|
| Stage 1 | 2,250 beacons |
| Full grid | 4,012 beacons |
| Maintenance fee | 5 PLN per unit per month |
Result: Stage 1: PLN 135,000 per year; full grid: PLN 240,720 per year; difference PLN 105,720.
Note: Sample calculation at the PLN 5 rate from the offer document; indicative ranges from 2025-2026 deployments; individual pricing.
Video
Frequently asked questions
Can stage 1 be expanded to the full grid?
Yes. Beacons are battery powered, so adding more requires neither power supply nor downtime. State the unit price for expansion in the request.
Where does the PLN 5 per unit come from?
It is the rate from the offer document, used in the sample calculation. The actual quote is individual and depends on the scope.
How do I count beacons in a building with several floors?
Sum the area of all floors and divide by 100-200 m2 per beacon. Plant roads are covered separately, about every 100 m.
We will calculate the grid for your building
Based on the floor plans we will prepare two variants: stage 1 and the full grid, with the number of units and the annual cost.
Let's talk