What happens after SOS is pressed
An SOS alarm from a watch creates its own alarm permit, starts the rescue chain in the messenger and by phone through the PBX, and lasts until a person closes it. This means security is not the only recipient of the alarm, but it is often the first point where someone is physically present around the clock.
The stillness alarm works in a similar way: it notifies the responsible persons, creates an alarm permit from the ALARM template, marks the place on the map and can trigger a webhook, for example a phone call to the duty person. When the employee moves again, the stillness permit closes by itself. The difference matters: a stillness alarm may close automatically, an SOS never does.
Role of security: taking the call and getting there
In practice it is worth assigning two people at the plant: the one who takes the phone call from the rescue chain, and the one who physically reaches the place. On the night shift, when the guard is alone at the gate, taking the call falls to them, and reaching the place falls to the plant's duty team. Write this into the procedure so that no decisions are made during an alarm.
After taking the call, the guard confirms receipt of the message, reads the place of the event on the map and passes it on according to the procedure. The guard does not close the alarm alone unless they are the supervisor assigned to the SOS template.
Sample alarm drill times (sample calculation)
Closing the alarm: who can and who should
The SOS alarm permit can be closed by the supervisor assigned to the SOS template. The SOS template must have a designated supervisor or owner, otherwise nobody except the person in distress can close the alarm. This is one of the most important checks before go-live: the administrator verifies that the template has a supervisor and records their duty in the rota.
Employee movement does not cancel the SOS alarm, and a second press of SOS on an open alarm permit does not create a duplicate or a second notification. That is why the guard does not close the alarm based on what they see on camera, and the supervisor closes it after confirming that the person is safe.
Stillness alarm: when closing is automatic
When the employee moves again, the stillness alarm permit closes by itself. Even so, security should note the event in the shift report, because the automatic closure does not explain why the employee was still. The supervisor should talk to the employee after the event has ended.
How to drill on the night shift
An alarm drill must be agreed with the plant, so that a real rescue action is not triggered. Good practice is a quarterly drill in a previously announced time window, on a test watch and with the participation of the plant's security manager. The drill checks three things: whether the phone call from the rescue chain was answered, whether the guard pointed to the correct place on the map, and whether the supervisor closed the permit.
Record the drill result in three numbers: the time from pressing to answering the call, the time from answering to arriving at the place, and the time to closing the permit. At the next drill compare these numbers and determine which stage takes the longest.
Mistakes that repeat at plants
The most common mistake is an SOS template without a supervisor. The second is no current duty number in the rescue chain. The third is assuming that a second press of the button will strengthen the alarm, while the system does not duplicate it. The fourth is believing that employee movement is enough to close an SOS alarm.
Checklist
Video
Frequently asked questions
Can the guard close an SOS alarm?
Only if they are the supervisor assigned to the SOS template. Otherwise the supervisor closes it.
Does a stillness alarm also need to be closed by hand?
No, it closes by itself when the employee moves again. Security still notes the event in the shift report.
What about a second press of SOS?
On an open alarm permit it does not create a duplicate or a second notification.
Do you drill your SOS response?
We will help plan an alarm drill on a test watch and check the SOS template. Let's arrange a call.
Let's talk