Why the shift handover is critical
At the gate of a production plant three shifts change around the clock. Each of them operates the security panel, but inherits from the previous one a state it did not see: people who entered before its shift, alarms opened earlier and refusals that were not handled. Without a written handover, the incoming shift starts from zero, although the plant is not starting from zero.
The panel has five views: the gate, the list of companies and employees, the employee card, the work permits for today and the list of people on site. For the handover two are mainly needed: the list of people on site and the work permits for today, and to them are added the information about alarms and refusals.
Four things the outgoing shift hands over
Good practice is a fixed routine, always carried out in the same order, on the screen, with both shift managers taking part.
The list of people on site
The outgoing shift manager opens the list of people on site and, together with the incoming guard, compares the number of people on the list with the number of people the guard believes are on the plant. A mismatch is a signal that someone did not scan an entry or an exit. A refusal leaves a trace, and a person who was refused is not counted as being on site, so they should not appear on the list.
Open alarms
An SOS alarm lasts until a person closes it, and employee movement does not cancel it. The outgoing shift must therefore confirm that no alarm is open, or hand over who is responsible for it. A second press of SOS on an open alarm permit does not create a duplicate, so the number of open alarms is reliable.
Refusals from the night
The refusal register shows whom access was refused and for what reason. The incoming shift should know the refusals that repeat for the same person or company, because they point to a problem to be resolved with the plant, not with the guard. The handover also covers which refusals were reported by notification and whether anyone responded.
Forgotten exits
A person who forgot to scan their exit is checked out automatically after 12 hours, and the task runs every 3 hours. Until then they remain on the list. The outgoing shift manager points out the people who, to their knowledge, have already left the plant but are still on the list, so that the incoming shift does not look for them during a possible evacuation.
Handover time by element (sample calculation)
Handover rhythm: eight minutes at the gate
In the sample calculation we assume a gate run in three shifts, with one guard per shift. The handover then takes place three times a day. If each takes eight minutes, the daily cost of time is 24 minutes, and roughly 12 hours a month. This is the time the plant buys to avoid searching for gaps in the middle of the night.
The eight minutes divide into four elements of two minutes each: the list of people, alarms, refusals and forgotten exits. The assumption is illustrative, and each plant should adjust the time to its own number of people on site.
What to record in the shift report
A security shift report does not have to be long. Five fields are enough: the number of people on site at the moment of handover, the number of open alarms, the number of refusals in the shift, the people with a forgotten exit to be clarified, and notes for the plant. Both shift managers sign the report, and the plant's security manager receives a copy. More about the report from the register of entries and refusals is on a separate page of the guide.
Mistakes to avoid
The most common mistake is an oral handover in the passage between the guard post and the changing room. The second is a handover without opening the panel, from memory alone. The third is assuming that an alarm closed itself at night because the employee returned to movement. The fourth is skipping refusals as irrelevant because nobody got in.
Checklist
Video
Frequently asked questions
How long should a good handover take?
In the sample calculation, eight minutes at the screen of the panel. The time depends on the number of people on site.
Does the guard have to check forgotten exits by hand?
The system checks out automatically after 12 hours, but the shift manager should point out the people who, in their view, have already left.
Who is responsible for an open alarm after a shift change?
The alarm stays open until a person closes it, so the handover must name the person responsible.