Two models of paying for hardware
InnerWeb is a software producer. The InnerWeb industrial beacon has an industrial design registration, a CE declaration and an ATEX design for zones 2/22. The remaining hardware, meaning active cards, multi-chargers and gates, is purchased and integrated. The plant can choose rental within a subscription or purchase.
In the rental model the cost of the hardware is included in the monthly fee, and service and battery replacement are part of the service. In the sales model the plant pays once, and it plans battery replacement and service in its own budget.
Unit prices in the sales model
The indicative unit prices are: active card 220 PLN, card housing 40 PLN, 28-slot multi-charger 3,400 PLN, internal gate 550 PLN and external gate 1,470 PLN net. The amounts are indicative ranges from 2025-2026 deployments; individual quote.
- Active card: 220 PLN net per unit, housing 40 PLN net.
- 28-slot multi-charger: 3,400 PLN net, which is about 121 PLN per slot.
- Internal gate: 550 PLN net, external gate: 1,470 PLN net.
Cost structure of the sample purchase set
Sample calculation for a large plant
Let us assume a plant with 50 gates (40 internal and 10 external), 300 active cards in housings and 4 multi-chargers. The purchase cost is 40 times 550 PLN, which is 22,000 PLN, plus 10 times 1,470 PLN, which is 14,700 PLN, plus 300 times 260 PLN (card with housing), which is 78,000 PLN, plus 4 times 3,400 PLN, which is 13,600 PLN. In total 128,300 PLN net, paid once.
At this scale the replacement of cards and the servicing of gates after a few years become a separate budget item by themselves, so the comparison with a subscription has to be made over a horizon of at least 48 months, which is a full battery cycle of the beacons.
Beacons: subscription at 7 PLN per unit
For 100 beacons the subscription is 700 PLN net per month, and for 300 units 2,100 PLN net per month. Over a 48-month cycle one beacon costs 336 PLN net on rental, including the battery replacement about every 4 years.
Selection rule: divide the purchase price of a beacon from the quote by 7 PLN. The result is the number of months after which buying would equal renting. If the result exceeds 48, renting wins, because the battery has to be replaced within that time. With an example price of 250 PLN the threshold is about 36 months, but the actual price is set by an individual quote.
Pilot as a way to make the decision
Maintenance of the pilot at 1,650 PLN net per month covers 100 BLE beacons and 3 mobile devices, and access to 12 modules. The pilot can run for several months without additional costs, so the plant collects data on usage and on the number of points it needs before it decides to buy.
Seven modules work within the same license without an additional license fee. Four modules: employee geolocation, tool geolocation, stillness detection and traffic analytics, require additional hardware, which has to be included in the calculation.
How to choose the model for your scale
For a plant with up to several dozen beacons the difference between the models is small in the scale of the annual budget, so the decision is driven by cash flow: rental moves the expense from investment to current costs. For hundreds of beacons the predictability of battery replacement matters more. In rental the cost is fixed and includes the replacement, while in purchase replacements accumulate in a single year. It is therefore worth asking about the replacement plan and about who keeps the records of batteries and cards.
Questions for the supplier before the decision
Ask for a quote for buying and for renting the same set, for the scope of service and for the response time for damaged units. Ask whether external gates in difficult conditions are covered by the same rate, and whether the number of units can be changed during a rental contract. Also check what happens to the hardware after the end of cooperation.
Sample calculation: purchase of a set for a large plant
| Parameter | Value |
|---|---|
| Internal gates | 40 pcs at 550 PLN |
| External gates | 10 pcs at 1,470 PLN |
| Active cards with housing | 300 pcs at 260 PLN |
| 28-slot multi-chargers | 4 pcs at 3,400 PLN |
Result: 22,000 + 14,700 + 78,000 + 13,600 = 128,300 PLN net one-time
Note: Sample calculation on the assumptions above. Indicative ranges from 2025-2026 deployments; individual quote.
Video
Frequently asked questions
Are cards and chargers included in the rental?
In the rental model these items are included in the monthly fee. The detailed scope is set by an individual quote.
What about the battery in the beacon?
Battery replacement about every 4 years is included in the rental service. When buying, the plant plans the cost of replacement.
Can we start with rental and move to purchase?
Yes, provided it is agreed in the order. The pilot lets you check the number of points needed before the decision.
Let us compare both models for your plant
We will prepare a rental and purchase comparison for your number of gates, cards and beacons over a 48-month horizon.
Let's talk