What the first-year budget is made of
The budget for the first 12 months is the sum of the one-time deployment cost and twelve monthly fees. The deployment covers launching the instance, the map, training and the configuration of permits. The monthly fee is the maintenance rate, which includes a dedicated instance, licenses, the training module without limit, backups, updates and security patches, and support without billing of working hours.
The payment for the deployment is split into two parts: 50% at the order and 50% after go-live. The deployment is billed under an order independently of the maintenance contract. All amounts below are indicative ranges from 2025-2026 deployments; individual quote.
Scenario 1: one site and 10 users
For one site the deployment costs 13,000 PLN net and the maintenance 2,000 PLN net per month. The first year is 13,000 PLN plus 12 times 2,000 PLN, which gives 37,000 PLN net. Ten users is the minimum of the flexible license, so small safety and security teams do not pay for spare licenses.
Cost of the first 12 months: deployment and maintenance
- Deployment
- Maintenance 12 months
Scenario 2: two sites and 10 users
For two sites the deployment is priced at 21,000 PLN net and the maintenance at 2,600 PLN net per month. The first year is 21,000 PLN plus 12 times 2,600 PLN, which gives 52,200 PLN net. The difference against scenario 1 is 15,200 PLN, so the second site adds about 41% to the cost of the first year.
It is worth noting that extending to a second site after the pilot costs 8,000 PLN, which gives the same total as ordering two sites at once. The plant therefore does not lose anything by spreading the decision over time.
Scenario 3: two sites and 50 licenses
When about 50 active users work across two sites, the deployment still costs 21,000 PLN net, while the maintenance rises to 4,300 PLN net per month. The first year is 21,000 PLN plus 12 times 4,300 PLN, which gives 72,600 PLN net.
The shared pool of 50 licenses can be divided between the sites in a variable way, for example 35 and 15, without an annex. The training module is billed separately for each site: 1,200 PLN net per month for the first one and 600 PLN net per month for each additional one.
Which items change the result the most
In scenario 1 the maintenance makes up 65% of the first-year cost, and in scenario 3 already 71%. This means that over a longer horizon the monthly rate decides, not the one-time deployment. For this reason purchasing should compare the cost over 36 months and not only over the first year.
The second lever is the number of active users. The flexible license costs 80 PLN net per person, and the fixed package of 50 licenses costs 2,500 PLN net per month, so the break-even point falls at about 30 active users. A plant that plans to exceed this threshold in the first year may order the package right away.
How to turn the budget into a purchasing decision
For the board of the plant it is useful to have three figures side by side: the cost of the first year, the monthly cost after deployment and the threshold for changing the license model. In scenario 1 the monthly cost after deployment is 2,000 PLN net, in scenario 2 it is 2,600 PLN net, and in scenario 3 it is 4,300 PLN net. Over a 36-month horizon scenario 1 gives 13,000 PLN plus 36 times 2,000 PLN, which is 85,000 PLN net. Scenario 2 gives 21,000 PLN plus 36 times 2,600 PLN, which is 114,600 PLN net. Scenario 3 gives 21,000 PLN plus 36 times 4,300 PLN, which is 175,800 PLN net. This is a sample calculation based on the assumption of a fixed rate, without hardware and without additional services. We recommend comparing it with the costs of the current methods, for example paper permits and manual counting of attendance, on the same assumptions about the number of people and permits.
What the budget does not include
The budget does not include hardware, meaning beacons, cards, gates and chargers, which are priced separately as rental or purchase. It also does not include additional services: the PBX dialer at 300 PLN net per month, SMS at 0.25 PLN net per message, or trainings and additional works at about 300 PLN gross per hour plus travel.
Sample calculation: 2 sites and 50 licenses
| Parameter | Value |
|---|---|
| Deployment of two sites | 21000 PLN net one-time |
| Maintenance with the 50-license package | 4300 PLN net per month |
| Period | 12 months |
Result: 21,000 PLN + 12 x 4,300 PLN = 72,600 PLN net in the first 12 months
Note: Sample calculation. Indicative ranges from 2025-2026 deployments; individual quote.
Video
Frequently asked questions
Are the amounts net or gross?
All amounts in this calculation are net. VAT is added according to the applicable rates.
Are trainings included in the costs?
The training module is included in the maintenance rate with no limit on the number of trainees. Additional trainings and works outside the scope are billed at about 300 PLN gross per hour plus travel.
Does the budget include hardware?
No, the calculation covers deployment and maintenance. Hardware such as beacons, cards and gates is priced separately, as rental or purchase.
We will calculate the budget for your scale
Give us the number of sites and active users and we will prepare a calculation for 12 and 36 months.
Let's talk