Who these recommendations are for
These recommendations are written for the reception and security manager of a production plant who issues badges to visitors, contractors and drivers. They concern the printing of a label from the system, not the choice of a reader. They rest on the behaviour of the label described in the function documentation and on the question of what a lost object reveals.
Seven recommendations
The order follows the path of the label: what is on it, how it is printed, and who has access to it.
1. Print only the first name, the company and the QR code
The label has a neutral look: the plant logo, the QR code, the first name and the company. That is enough for a person who needs to recognise a visitor on the floor and for a scanner that needs to identify them. Every extra element increases what a lost badge reveals.
2. Do not print the server name or the address as text
The instance address is encoded in the QR code, but it should not appear on the label as text. The person who finds the badge should see a code, not the address of the plant's internal system.
3. Do not add access rights or zones
Information about which hall a visitor may enter is needed by the system, not by a stranger. The server checks the rights at the moment of the scan. A colour or a plant marking is enough on the label, if the plant uses one.
4. Keep at least 13 mm for the code
The QR code does not go below 13 mm, and label dimensions are limited to the range of 13 to 233 mm. With a smaller code the gate scanner reads worse, and a badge that is hard to read ends in manual entry, which lowers security.
5. Do not type the token by hand
The token is a string of 64 characters that is unreadable for a person. There is no reason to copy it onto paper. Without the string on paper, nobody can read it from a lanyard, and guessing is out of the question because the token comes from 32 random bytes.
6. Print only after logging in
The print page contains badge tokens in its print addresses, so it sits behind a login with the security or administrator role. The print station at reception should have an account with the right role, not a shared account used by everyone.
7. Plan replacement instead of spare prints
Do not print spare badges in advance. The first print of a label for a person without a badge issues a new one automatically, and revoking an old badge has the same effect on it. A stock of spares is a risk that is hard to count.
Label dimension limits
What the finder of a lost badge sees
With these settings, a person who finds the badge sees the first name, the company and the code. A scan with a phone does not reveal whether the code is active, nor who the holder is beyond what is printed. This changes the conversation about lost badges: instead of an alarm, a replacement is enough, because the old token stays in the history as revoked.
The visitor's data appears only at the gate and on the training tablet, where authorised equipment scans. The security dashboard does not receive the token in the API response, only derived facts, for example whether the person has an active badge.
How to check the print before the first change
Print three test labels for fictitious visitors and look at them the way the finder would. Ask a colleague from outside security what they conclude from them. If they can point to a hall, a function or the rights, the label contains too much. Then scan each one at the test gate and check readability at the smaller size.
Checklist
Video
Frequently asked questions
Can the plant name be printed on the badge?
Yes, as the plant logo. Do not print the server name or the system address as text on the label.
How big should the QR code be?
No smaller than 13 mm. The system limits the label dimensions to the range of 13 to 233 mm.
What should be done with a lost badge?
Revoke it and issue a new one. The old token stays in the history as revoked, and the lost badge reveals nothing beyond the printed first name and company.
Let's review your label
We will go through the label layout and the print settings at reception with you. Book a conversation with the InnerWeb team.
Let's talk