InnerWeb
Skip to main content

Checklist: QR label printing workstation behind login

A QR label printing workstation looks harmless: a printer, paper and a page in the browser. Yet the print page contains badge tokens, so the secretariat and IT should check who has access to it, what the labels look like and which limits protect the guest invitations.

13 mm
minimum size of the QR code on the label
Source: feature card
144
addresses in one bulk invitation
Source: feature card

Access: who can open the print page

Guard labels are printed behind login in the guard or administrator role, because the print page contains badge tokens in the print addresses. This is the first thing to check: open the print page in a window without login, and then on an account without the guard role. In both cases you should not see any tokens.

Pay attention to the computer at which the workstation stands. If it is a shared secretariat computer, set the rules for logging out and screen locking, because a logged-in session with access to the prints is access to the tokens of active badges. Inform the staff that the address history in the browser is not a safe archive.

First print and badge replacement

The first label print for a person without a badge automatically issues a new badge and records the fact of printing. This means that a repeated print after a loss is not an ordinary copy: if the badge has been replaced, the new token replaces the old one, and the old one stays in the history as revoked.

At acceptance of the workstation print a label for a test person without a badge and check in the panel whether the badge was issued. Then replace the code and check whether the old label has stopped working at the gate.

Limits of the print workstation and invitations

Limits of the print workstation and invitationsChart: 144 addresses per request, label dimension from 13 to 233 mm, 5 requests in a 13-minute window.050100150200250valueAddresses per requestAddresses per request: 144 value144Max label dimension (mm)Max label dimension (mm): 233 value233Min label dimension (mm)Min label dimension (mm): 13 value13Limit window (min)Limit window (min): 13 value13Requests in the windowRequests in the window: 5 value5
Source: InnerWeb feature cards: label printing and bulk invitations

Label: appearance and size

The label has a neutral look: the plant logo and a QR code with the name and company, without the name of the server. The QR code size does not go below 13 mm, and the label dimensions are limited to the range of 13-233 mm. When choosing the paper and the printer, check that they fit within this range.

Print a sample and scan it with the same scanner that will be at the gate, under typical lighting conditions. A small or blurred code is the most common cause of complaints at the gate, not a system error.

  • Print without the server name on the label.
  • Code not smaller than 13 mm.
  • Label dimensions within the range of 13-233 mm.
  • Scan of the sample with the gate scanner.

Bulk invitations and limits

Bulk guest invitations have a limit of 144 addresses per request and 5 requests per 13 minutes per user. The limit stops a script on a hijacked session and does not get in the way on a day of mass invitations. Check with the secretariat how large the groups you usually invite are, and whether several requests within an interval are enough for the day with the largest number of guests.

When planning larger events, divide the address list into parts of at most 144 and record who sends the subsequent parts. If the list exceeds several requests in a short time, plan a break instead of raising the limit.

E-mail with the code and people without a phone

Each person receives the e-mail with the QR code at most once, thanks to an atomic marker in the database. A new badge after a code replacement triggers a new e-mail with the new code. The e-mail goes out only after the trainings required at the gate have been completed, so a guest who has not completed the training does not receive the code.

A person without an e-mail and without a phone receives a print from the guard. Record in the workstation instructions who prints the label in such a situation and how it is handed over. Check in a test whether after a code replacement the new e-mail actually goes out.

Checklist

Video

Frequently asked questions

Why must the print page be behind login?

Because the print addresses contain badge tokens. Access limited to the guard or administrator role restricts their disclosure.

Can the secretariat send invitations for one hundred and fifty guests at once?

One request accepts up to 144 addresses, so such a list must be split into two parts. This fits within the limit of 5 requests per 13 minutes per user.

What does the system do on a second label print for the same person?

If the badge has been replaced, the new token replaces the old one, and the old one stays in the history as revoked. The new badge triggers a new e-mail with the new code.

Let's start the print workstation without surprises

We will check with the secretariat and IT the access, the label size and the invitation limits, before the first guest collects a badge.

Let's talk