InnerWeb
Skip to main content

Checklist for issuing a guest QR badge at reception

Reception issues a QR badge dozens of times a day, so the order of steps has to be fixed. This checklist guides the receptionist through the guest account, the declaration, training, the host and closing the visit, so that the badge does not open more than it should.

256 bit
length of the random badge token
Source: karta
13 s
refresh interval of the evacuation list
Source: karta
4 languages
guest induction training: PL, EN, UA, RU
Source: karta

Before you issue a badge: is the visit planned?

Check whether the guest has a planned visit. A planned visit replaces the requirement for a one-day permit for people entering without work, but training, qualifications and an active account still decide on entry. A visit is therefore not a pass without conditions.

For a contractor who is to carry out work, the permit and qualifications are needed regardless of the badge. Direct the contractor to the work path, not to an ordinary visit.

Guest account and badge in one action

The reception tile turns the guest's first and last name into an external account with an employee number and a printed QR badge in one action. If the guest has already been on site, first check whether their account exists, so that you do not create a duplicate.

The printed badge carries a 256-bit token from a random generator, so no number has to be retyped by hand. The printout can be repeated from the security panel, and invalidation issues a new badge without deleting the history.

Parameters of issuing a guest QR badge

Parameters of issuing a guest QR badgeBar chart: list refresh every 13 seconds, four training languages, six groups on the evacuation list051015numberRefresh of the list (s): 13 number13 numberRefresh of the list (s)Training languages: 4 number4 numberTraining languagesGroups on the evacuation list: 6 number6 numberGroups on the evacuationlist
Source: Feature cards: evacuation list, kiosk training

Declaration and induction training

Health requirements, such as a declaration at entry, depend on the site's policy and the audited standard. At a site that has introduced such a requirement, the guest signs the declaration before entry, and the gate checks it together with the training.

The guest completes induction training on the tablet: identification, material in the form of PDF slides or a video, and a multiple-choice test. The material is available in four languages: Polish, English, Ukrainian and Russian. The message with the personal QR code reaches the person only once the gate lets them through in terms of training.

Host and first entry

Assign a host to the guest. The host receives a phone call once, at the guest's first entry, so you do not have to call manually each time. When the badge is scanned, the security panel returns a verdict: valid trainings, qualifications, a permit in progress and an active account.

The scan alone records the entry, and the gate scans also feed the evacuation list, which refreshes every 13 seconds and shows guests as a separate group of six. In an evacuation it is therefore known which guests are on site.

Closing the visit and return

After the visit, collect the badge or invalidate it in the panel if the guest did not return it. A paper badge does not need to be physically returned, but the code should stop working, so that it does not open the gate on the next attempt.

If the guest comes back, the system can use the existing account and issue a new badge. For returning guests this reduces reception time and duplicates.

Checklist

Video

Frequently asked questions

Does the QR badge open the gate without training?

No. Training, qualifications and an active account still decide on entry, and the gate returns a verdict after the scan.

What do we do when a guest does not return the badge?

Invalidate the badge in the security panel. The system will issue a new one at the next visit, and the badge history is kept.

Does the host get a phone call at every entry?

No, the host gets one call, at the guest's first entry during the visit.

Is a planned visit enough for a contractor?

No, if the contractor is to carry out work. They then need a permit and qualifications, regardless of the badge.

Let's go through badge issuing with reception

Book a demo: we will show issuing a QR badge step by step, the scan with a verdict and invalidation after the visit.

Let's talk