Who these recommendations are for
We address the recommendations to the shift manager in a warehouse or logistics centre who works with an existing access control system and employs agency workers. The access control system and the cards stay on the client's side. InnerWeb does not produce or replace readers; it receives swipes from the access control system and links them to the person's account, training and attendance.
The night shift has less support than the day shift: security is small, the HR office is closed and the agency is hard to reach. For that reason the rules must be simple enough for the manager to follow on their own.
Recommendation 1: confirm identity and valid training before you issue a card
A temporary card is issued to a person, not to a number. The shift manager should find the person's account in the system. The account search at the workstation requires at least 3 characters of the surname, returns up to 13 results and does not reveal the card number, which reduces the risk of a mistake or a leak. Before the card reaches the person's hands, check that they hold a valid induction training. The training result belongs to the account, so it is not lost together with the lost card.
Temporary cards outside the site, cumulative, example
- No return date
- With return date
Recommendation 2: block the lost card before you issue a replacement
A lost card may fall into someone else's hands. Before the shift manager issues a temporary card, they should ask security to deactivate the lost number in the access control system. If security is not available, the rule must say who does this in the morning and until when the old number stays active. Record the time of the report, so that later swipes of the old number can be read as use by a third party.
Recommendation 3: the temporary card has a number from the pool and a return date
A temporary card should come from an agreed pool of numbers, clearly marked on the front. The swipe notification carries the number of the person's active card, so the new number must be assigned to the account, not to the shift. Set a return date: the end of the shift, the next working day or the day a new card is dispatched. A card without a date becomes a permanent card that nobody settles.
Recommendation 4: record the event where HR can see it
Information about the lost and issued card should reach a document that HR and the agency coordinator will see in the morning. A short note is enough: the person, the agency company, the number of the temporary card, the time and the return date. This way the agency coordinator knows to remind the person about the return, and security does not have to search for the card a week later.
If the person was not known to the system before, their first swipe creates an account and a company from the notification data. For that reason the access control vendor should pass the first name, surname and company name in a uniform form, which we describe in a separate article.
Recommendation 5: do not move the training to the card, move it to the person
A common mistake in plants that use agencies: after a card is lost, a new account is created because the old one seems out of date. The consequences are duplicate accounts and lost training results. The rule should say: the person's account stays, only the card number changes. If a duplicate has nevertheless been created, a training result recorded on the deleted account is redirected to the account it was merged with, for up to 3 consecutive merges.
Recommendation 6: decide what a person without a card does when time is short
Sometimes a temporary card is not available: the card box is empty or only security holds the key. An alternative rule may allow entry with a visitor QR code and record the entry from the panel. Recording an entry or exit creates a gate entry, so the person appears on the evacuation list and in the On site view. This is an exception that the manager documents, not the standard path.
Recommendation 7: settle the card pool once a month
A report on the temporary card pool shows which numbers have come back and which remain outside the site. For an example pool of 80 cards and losses of about 5 percent a month, the site loses about 4 cards a month, which over a year amounts to about 48 cards to replace. This is an example calculation on assumptions, and it justifies a return deadline and a deposit or deduction under the agency contract.
Video
Frequently asked questions
Should a new account be created after a card is lost?
No. The training result belongs to the person's account, so the account stays and only the card number changes.
Does the account search show the card number?
No. It requires at least 3 characters of the surname, returns up to 13 results and does not reveal the card number.
What if no temporary card is free?
An alternative rule may allow entry with a QR code and record the entry in the panel, and the manager documents the exception.
Who settles the temporary card pool?
Site security, together with the agency coordinator, on a monthly cycle.
Tidy up the rules for the night shift
Book a call about the temporary card procedure in your warehouse. We will help connect it with accounts, training and attendance.
Let's talk