What the cost of a temporary card consists of
The cost of a temporary card is not the price of the plastic. It consists of three security activities: issuing and registering the card at the first entry, deregistering and recovering it when the person leaves, and explaining situations in which the card was lost or was not returned.
On top of that comes the time of the agency coordinator, who passes the list of names, and the time of the secretariat, which sets up the accounts. The calculation below focuses on security time, because it is the easiest to measure with a stopwatch at the gate.
Assumptions of the sample calculation
The figures below do not come from any specific plant. They are explicit sample assumptions, which each plant replaces with its own measurements. We recommend measuring the issuing time with a stopwatch over one full shift before adopting anything into the budget.
We assume a logistics centre where people from several agencies work and turnover is high, because some people leave after a few weeks.
- 600 temporary card issues per month (new workers and replacements)
- 4 minutes of security time to issue and register one card manually
- 3 minutes of security time to recover and deregister one card
- System variant: 1.5 minutes to issue and 1 minute to recover, because the person creates the account from the invitation and security verifies the QR code before issuing a card
- The hourly cost of security work is left out: the reader multiplies by their own rate
Security time for temporary card rotation per month
- Manual
- Invitation and QR code
Result: hours of security time per month
Manually: 600 issues times 7 minutes (4 plus 3) is 4200 minutes, that is 70 hours of security time per month. With the variant based on the invitation and the QR code: 600 times 2.5 minutes is 1500 minutes, that is 25 hours.
The difference is 2700 minutes, that is 45 hours per month, roughly one full security position for more than a quarter of a month. With other assumptions the result will change, but the proportion stays: the largest fraction of time disappears where personal data used to be typed in from a document.
What has to be in place for the saving to be real
The saving does not appear by itself. The first condition is an invitation sent before the person arrives, preferably in bulk by the agency coordinator. The second is a QR code which can be sent again by email or SMS if it is lost. The third is an account search at the station which requires 3 characters of the surname, returns up to 13 results and does not reveal the card number.
The fourth condition is organisational: the list of cards to be recovered must be kept at the exit, not after a month. The status of the person when they leave the company helps with this. Without discipline in recovery, cards get lost and the cost grows by their purchase price.
Indicative price ranges and notes
The cost of the licence and integration depends on the number of modules and on the scale. We give only indicative ranges from 2025-2026 implementations; an individual quote is needed, because it depends on the number of gates, kiosks and the scope of integration with the existing access control system.
InnerWeb does not sell cards or access control readers, so their cost remains on the side of the plant and its supplier. The system supplements the existing access control.
Temporary card rotation: security time per month
| Parameter | Value |
|---|---|
| Temporary card issues | 600 pcs/month |
| Manual issuing and registration | 4 min/card |
| Manual recovery and deregistration | 3 min/card |
| Issuing with QR code | 1.5 min/card |
| Recovery with list in the system | 1 min/card |
Result: Manual 70 hours, with invitation and QR code 25 hours, a difference of 45 hours of security time per month.
Note: Sample calculation based on the assumptions above, not assigned to any specific plant. Indicative ranges from 2025-2026 implementations; individual quote.
Video
Frequently asked questions
Is 600 issues per month a realistic number?
It is a sample assumption for a large centre with several agencies. The plant replaces it with its own data from the issue register.
Does InnerWeb replace temporary cards?
Not always. A QR code can serve as a temporary entry, and the card stays where the plant's access control system requires it.
How to measure the time of issuing a card?
With a stopwatch at the gate over one full shift, separately for issuing and recovery, divided into day and night.
Let us calculate card rotation for your plant
We will put your figures of issues and gate time into this calculation. Book a conversation with InnerWeb.
Let's talk