Before the person arrives: invitation and account
The day before the start of work, the agency coordinator or the plant operator sends the person an invitation, and does not create their account by hand. This split reduces the number of steps for the secretariat and leaves personal data where it was entered, that is, with the person themselves.
Is an email address needed for the invitation?
No, one of two fields is enough. The invitation can contain an email address or a phone number: once one of the fields is filled in, the other becomes optional. This matters for temporary workers, some of whom do not use email but always have a phone.
What happens if the person does not create an account before arrival?
The invitation stays on the list. If the person has not activated the account but already has a gate entry or a valid training, the row gets the status No password and does not disappear from the coordinator's view. This way nobody loses track of a person who is already physically on site but has not completed registration on the phone.
Can a whole shift be invited with one list?
Yes. The bulk invitation accepts pasted text with addresses, removes duplicates, converts letters to lower case and handles up to 144 addresses in one invitation. The detailed procedure is described in the guide on the bulk agency invitation.
QR code: how it reaches the worker
For an agency worker the QR code is the basic document for the first entry. The gate reads it and records a gate entry, and the same entry later feeds the list of people on site and the evacuation list.
What to do when the person has lost the message with the code?
An active guest or an external company employee can be sent the QR code again by email. When the account has no email address, the system sends an SMS with a link to the code image itself, without logging in and without installing an app.
Is a printout needed at the gate?
No, it is not mandatory. In the invitation window there is an option to order a printed QR label from the secretariat, visible once the secretariat address is set in the email settings. It is worth using for people without a working phone, but most entries are handled by the code on the screen.
Limits on the first day of an agency worker
Induction training on the first day
Induction training is the most common reason for a delayed first shift, because without passing the test the person does not enter the hall. The system moves this stage to a kiosk, so the coordinator does not have to lead the group by the hand.
In which languages can the person pass the training?
The kiosk training system leads through the material, that is PDF slides or a video, and through a multiple choice test in four languages: Polish, English, Ukrainian and Russian. The person chooses the language at the start, and the coordinator does not have to arrange an interpreter for each shift.
Can a colleague be given the answers to the test?
The training can have a switch that shuffles the order of answers, enabled by default. An answer key in the style of A, C, B stops being useful, because the same answer has a different position in every attempt.
How to find the person's account at the training station?
The account search with an RFID card requires at least 3 characters of the surname and returns up to 13 results. The card number is not shown in the results, so a person standing nearby cannot see other people's data.
Gate entry and the first scan
At the first entry the security checks three things: whether the person has an account or a valid invitation, whether they passed the training and whether they have a QR code or a temporary card. The full checklist for the gate is provided in a separate checklist.
What if the plant access control system already registers cards?
InnerWeb does not produce access control readers and does not replace existing ones. If the plant has its own access control system, it can send card registration events to InnerWeb by webhook, and InnerWeb links them to the qualifications and attendance of the person.
What happens when nobody in the system knows the card yet?
A card registration by a person unknown to the system creates an account and a company from the data in the report. For this reason the access control supplier should pass the first name, surname and company name in a uniform form, and the agency should keep the same spelling of the company name in every shift.
After the first day: who sees what
The training and qualification result belongs to the person's account, not to one shift. When the agency moves a worker to another client in the same plant, the guest can be moved to another external company on the same account: training results, the pass and the entry history stay with the person.
In the panel of external companies and guests the coordinator sees the list of agency workers, the pending invitations and the default contact person of the company. The coordinator does not see the data of other agencies, so the settlement is clear for each of them.
Video
Frequently asked questions
Does an agency worker need an account before entering?
They do not need to activate it in advance. An invitation with a gate entry or a valid training gets the status No password and stays on the list, and the person completes registration on the phone.
What to do when the person has lost the QR code?
Send it again by email. When the account has no email address, the system sends an SMS with a link to the code image.
Does deleting an invitation block entry?
Yes. As long as the invitation is on the list, the person can enter, so the coordinator blocks access by removing the invitation from the list.
Does InnerWeb replace the readers at the gate?
No. InnerWeb is an independent supplementary system and integrates with the existing access control system of the plant.
Let us talk about the first day of your agencies
We will show the procedure from the invitation to the gate entry record on a sample account. Book a short demo of InnerWeb.
Let's talk