InnerWeb
Skip to main content

Security system budget split by line items: 7 recommendations for the finance director

The security system budget is worth splitting into four items: hardware, licences, implementation and maintenance. Each has a different accounting character and a different payment rhythm. Below are seven recommendations that help agree the split with accounting before the order is placed, based on examples from calculations for industrial plants.

13 000 PLN
implementation of one location, net
Source: offer card
37 000 PLN
first year, 1 location, 10 users
Source: offer card
43%
share of the investment in the 5-year budget
Source: sample calculation

Who these recommendations are for

The recommendations are addressed to the finance director, the controller and the investment manager who prepare the order for a security system and must agree the classification of spend with accounting. They apply to plants where the system supports occupational health and safety, security and maintenance operations.

The split into four items is not a matter of presentation. Hardware can be a fixed asset, licences and maintenance are a current cost, and implementation needs a separate assessment. An error at the ordering stage means later corrections of documents and unnecessary talks with the auditor.

Recommendations 1 and 2: separate hardware from software and ask about the manufacturer

Recommendation one: in the quotation, require separate items for devices and software. InnerWeb is the software manufacturer; the industrial beacon has an industrial design registration, a CE declaration and an ATEX execution for zones 2/22, and the remaining hardware, such as trackers and multi-chargers, is purchased and integrated. Separating the items lets you assign each one to the right category.

Recommendation two: decide whether the devices are to be rented or bought. There are two billing models: rental under a subscription (a one-off implementation, with licences and devices paid monthly), or sale of devices with licences under a subscription. The contract is for an indefinite period with monthly notice, and installation takes 2 to 10 weeks from the order. The choice of model determines the rest of the split.

First-year structure: 1 location, 10 users

First-year structure: 1 location, 10 usersPie chart: 13,000 PLN implementation and 24,000 PLN subscription in the first yearImplementation: 13,000 PLN net (35.1%)Subscription, 12 months: 24,000 PLN net (64.9%)37,000PLN netImplementation13,000 PLN net (35.1%)Subscription, 12 months24,000 PLN net (64.9%)
Source: Offer card: 13,000 PLN plus 12 times 2,000 PLN

Recommendations 3 and 4: implementation as a one-off cost and licences by active users

Recommendation three: treat implementation as a separate one-off item with a breakdown of its components. Implementing one location in a pilot costs 13,000 PLN net, and two locations in a single schedule cost 21,000 PLN net. Extending to a second plant costs 8,000 PLN net, which is the same total as the two-location variant. It is worth asking exactly what is included in the implementation: mapping, configuration, training, integrations.

Recommendation four: plan licences by active users. A licence is counted per account with at least one login in a calendar month, so you pay for the resources actually used. A flexible licence costs 80 PLN per logged-in user per month with a minimum of 10 users, which is from 800 PLN net, while a fixed package is 50 licences for 2,500 PLN or 100 licences for 4,000 PLN net per month. The break-even point of the package is about 30 active users.

Recommendations 5 and 6: full first-year cost and multi-year horizon

Recommendation five: put the full cost of the first 12 months into the budget, not just the implementation. In the three offer scenarios it comes to 37,000 PLN net (1 location, 10 users: 13,000 PLN of implementation plus 12 times 2,000 PLN), 52,200 PLN (2 locations, 10 users) and 72,600 PLN (2 locations, 50 licences). This way the board sees the annual spend, not only the entry price.

Recommendation six: show the multi-year cost horizon. For the purchase scenario of owned devices, where the one-off spend is 147,000 PLN net (600 transmitters with installation at 170 PLN, 40 trackers at 900 PLN and 2 multi-chargers at 4,500 PLN) and the subscription is 3,200 PLN net per month, five years come to 339,000 PLN net. The one-off spend is 43%, the subscription 57%. A good quotation is an investment with assumptions, with a benefit and cost calculation over a 2-5 year horizon, not just the entry price.

  • scenario 1 location and 10 users: 37,000 PLN net in the first year
  • scenario 2 locations and 10 users: 52,200 PLN net
  • scenario 2 locations and 50 licences: 72,600 PLN net

Full cost of the first 12 months in three scenarios

Full cost of the first 12 months in three scenariosBar chart of first-year costs: 37,000, 52,200 and 72,600 PLN020,00040,00060,00080,000PLN net1 location, 10 users: 37,000 PLN net37,0001 location, 10 users2 locations, 10 users: 52,200 PLN net52,2002 locations, 10 users2 locations, 50 licences: 72,600 PLN net72,6002 locations, 50 licences
Source: Offer card, first-year scenarios

Recommendation 7: every item has a stated benefit

Recommendation seven: for each item, add the benefit it should deliver and the measure by which you will check it. An item without a stated benefit is a candidate for negotiation. This applies especially to optional extras such as the dialer, additional transmitters or extended modules.

Before signing, ask the supplier who counts as a licence user: supervising staff, or every person entering the site. Also ask about things outside the invoice: customer-side equipment, power supply at the points, integrations and support terms after implementation. All net amounts require adding 23% VAT, and the price ranges are indicative and require an individual quotation.

Checklist

Video

Frequently asked questions

Is the hardware always a separate item?

It is worth requiring this in the quotation. InnerWeb is the software manufacturer, and apart from the beacon the hardware is purchased and integrated, so separating the items is natural.

What does extending to a second location cost?

In the sample quotation, extending from the pilot to a second plant costs 8,000 PLN net, which is the same total as the two-location variant. The quotation is individual.

How are licences counted?

Per active user, meaning an account with at least one login in a calendar month. The fixed package pays off from about 30 active users.

Let's split the budget into items together

We will prepare a quotation with a split into hardware, licences, implementation and maintenance. Book a call.

Let's talk