InnerWeb
Skip to main content

Recommendations: the plant map structure model

Choosing the map structure model is the first decision of the project, because it defines what a hall, an area and a line mean in the editor. The editor distinguishes two models: a single-hall plant and a large-facility plant. Below you will find the selection criteria, recommendations for the deployment team and an indication of who makes the decision about the model.

2
structure models in the map editor
Source: card
18
InnerWeb modules based on a shared map
Source: card

Two models and what the terms mean

In a large-facility plant a hall is a view or a department, an area is a building, and a line is a floor. In a single-hall plant a hall is a hall, an area is a zone within it, and a line is a production line. The same words in the editor therefore mean different things, and a wrong choice of model results in names that do not match the reality of the plant.

For the large-facility model one more point matters: a hall is here a level of organisational division, not a physical object, so it has no solid. In the single-hall model the hall is a physical building, and the division into zones and lines applies to its interior.

  • large-facility: hall = department or view, area = building, line = floor
  • single-hall: hall = hall, area = zone, line = production line

Recommendations for choosing the model

The recommendations below help make the decision at the start of the project, before anyone begins drawing outlines. Each of them has a justification that follows from the way the editor treats the structure.

1. Count the buildings with a solid, not the departments

If the plant plan includes many separate buildings that the dispatcher should open with a double-click, choose the large-facility model. If the work takes place in one hall, where you are interested in zones and lines, choose the single-hall model.

2. Match the model to the security question

When security reports sound like "department, building, level", the large-facility model maps them as a view, an area and a line. When they sound like "assembly line, welding zone", the single-hall model is the natural choice.

3. Do not mix models within one plant

One plant has one model. Mixing causes the same level to mean a building in one place and a zone in another, and it discourages users from the map. If the plant has one large hall and several small buildings, decide which model better reflects most of the reports.

4. Plan the floors before drawing

In the large-facility model a line means a floor. The floor selector appears only when a building has at least two floors, so it is worth collecting the list of levels in advance and checking it against the plans.

5. Record the decision in the project documentation

Write the choice of model in one sentence in the implementation documentation, together with the justification. A year later, when someone adds a new department, it will be clear what the hall, the area and the line mean at this plant.

Who decides and who is consulted

The decision on the model is taken by the owner of the map on the client's side, usually the head of security or the head of maintenance, after consultation with the deployment team. It is their responsibility to decide how places are named at the plant. The deployment team advises how the model will affect names, colours and selectors in the editor.

The role of the IT integrator is to make sure that the chosen model matches the data the plant already keeps in other systems, such as access control or ERP. InnerWeb is an independent system that complements these solutions, so it is worth comparing the names on the map with the names used there, so that users do not have to translate one set of terms into another.

What the choice of model changes in daily work

The plant map is the common basis for the permit, security and location modules, and InnerWeb has 18 modules. A poor structure therefore shows up not only on the map but also in permits and reports, because they use the same areas. A well-chosen model saves later corrections of assignments.

It is worth running a test: draw one department or one hall in the chosen model, name it, and check with two people from security whether they can find the given locations. If they can, the model is right. If people take longer to find places than expected, consider changing the model before the map is extended.

Video

Frequently asked questions

Can the model be changed after drawing has started?

Technically yes, but it requires rewriting names and assignments. That is why the model is chosen before drawing and recorded in the documentation.

Which model fits a plant with one large hall?

The single-hall model, because the hall is a physical object here, and the division applies to zones and production lines inside it.

Does a department have a solid in the large-facility model?

No. The hall there is a level of organisational division, not a physical object, so it has no solid.

Who should choose the model?

The owner of the map on the client's side, after consultation with the deployment team and the IT integrator.

Let us choose the model for your plant

Based on the plant plan we will indicate which structure model will let the dispatcher find locations fastest. Book a short conversation.

Let's talk