Multifunction employee card: which functions to keep on the card and which to move to QR

One shared identifier for access control, working time, training and the canteen is tempting in its simplicity, but not every function should sit on it. The plant director needs a rule for the split: what the card does best, what a QR code handles better, and what an external system should do. Below are seven recommendations with their reasoning.

13 s
refresh interval of the evacuation list
Source: description of the evacuation list function
6
groups of people on the evacuation list
Source: description of the evacuation list function

Who these recommendations are for

The recommendations are addressed to the plant director, the IT manager and the security manager, who plan a shared identifier for employees on the payroll. We assume that the plant already has an access control system with proximity cards and wants to add time recording, training or other functions without a second identifier.

InnerWeb does not sell cards or access control readers. The recommendations describe how to split responsibilities between the card, the access control system and the InnerWeb software, which accepts punches and links them with training, permits and attendance.

Recommendations: seven decisions on the split of functions

The recommendations run from the simplest to those that require agreements with suppliers.

1. The card only for what needs a reader

Opening doors, gates and barriers are functions the card handles without the involvement of a phone or network. Leave them to the card and the access control system. Moving them to a phone increases dependence on the battery and on an app in a place where it must work without exceptions.

2. Tie training and its verification to the account, not the card

The training result belongs to the person's account. The security panel accepts a scan of a QR badge or an RFID card and returns a verdict made up of valid trainings, qualifications, an active permit and an active account. The card is only a key for finding the account, so replacing the card does not erase the history.

3. Keep one active account per person

When the same person has two active accounts, the system moves the training result to the account with the card, so the gate stops reporting missing training. It does not merge accounts by surname alone, so keeping the HR data in order remains the plant's responsibility.

4. Punches for working time come from the existing access control system

Gate scans create the working time records if you enable the module. Do not add a second reader; agree with the access control supplier that punch events are sent to InnerWeb. The module is disabled by default, so enabling it is a deliberate HR decision.

5. The evacuation list from one source

The list is built from gate scans, refreshes every 13 seconds and divides people into six groups. If employees enter with cards and guests with QR codes, everyone appears on one list. Two separate sources mean two lists to reconcile during an alarm.

6. Treat the active card as a separate layer

Pulses from active LoRa cards feed the same stillness mechanism as the data from the app. InnerWeb purchases and integrates active cards, it does not produce them. Do not link them to the access control identifier just because they fit on one lanyard: they have a different task, namely location and stillness.

7. Leave room for the keys of separate suppliers

A DESFire card holds several applications, and each has its own keys. Before buying cards, decide which suppliers will get an application and who owns the master key. We describe the details on the page about key separation.

Split of the seven recommendations by medium

Split of the seven recommendations by mediumOf the seven recommendations, two concern the card and access control, four the account and software, and one the active card.01234recommendationsCard and access control: 2 recommendations2Card and access controlAccount and software: 4 recommendations4Account and softwareActive card: 1 recommendations1Active card
Source: Example calculation: classification of the recommendations on this page

Why not everything on the card

The most common mistake is moving onto the card functions that the background system handles better. A card can be lost, lent or left in the changing room, and the account and trainings should survive each of these situations. That is why we separate the identity (the account) from the medium (the card, the QR code).

The second mistake is having no plan for people without a card: guests, temporary staff and contractors. For them, a QR code printed or sent to a phone, cancelled after the visit, is the better option.

Order of actions

Start with an inventory: which cards are in circulation, which applications are already on them, and who knows the keys. Then agree the punch specification with the access control supplier. Finally decide which functions to move to QR. This order reduces the risk that the second stage blocks the first.

  • inventory of cards, applications and key owners,
  • punch specification for the access control supplier,
  • pilot on one gate or hall,
  • decision on QR for guests and temporary staff.

Video

Frequently asked questions

Will one card replace all identifiers in the plant?

For functions that require a reader, yes, but identity and trainings are kept on the account. QR codes are the better option for guests and temporary staff.

Does InnerWeb supply cards?

No. InnerWeb is a software maker. It purchases and integrates active cards, while access control cards remain with the access control system supplier.

What about an active card and an access control card on one lanyard?

These are two separate layers. The active card serves location and stillness, the access control card opens passages.