InnerWeb
Skip to main content

FAQ: card, QR code and phone as an employee identifier

Employees most often ask one thing: what they should show today at the gate, at the training tablet and when recording working time. Below are answers to the questions of employees and HR, for sites that accept three carriers: a card, a QR code and a phone.

256 bit
length of the random QR badge token
Source: karta
3 characters
minimum for account search by surname
Source: karta
13 results
maximum list length in the account search
Source: karta

What can I show at the gate: a card, a QR code or a phone?

The site decides which carriers it accepts, and the system handles them in parallel. The security panel accepts a scan of a QR badge or an RFID card and returns the same verdict: made up of valid trainings, qualifications for hazardous work, an open permit and an active account. The scan itself records the entry, so security does not type anything by hand.

A QR code can be a printed badge or a message on the phone. A personal access code reaches the person only after the gate lets them through in terms of training, so nobody receives a pass that would be rejected anyway.

Does scanning my QR code at the training tablet log me in right away?

No. The scan logs nothing: the tablet shows the first name, last name and company of the code owner, and training starts only after confirmation with the question “Is it you?”. If you scanned someone else's code, you will see their name and answer no, so training is not credited to the wrong person.

When training starts from a badge, the form with company and login is not shown at all, even if the code was not recognised. Allowing someone to type another person's login would be exactly the error we want to rule out.

Identification parameters at the training station

Identification parameters at the training stationHorizontal bar chart: four training languages, maximum 13 search results, minimum 3 characters of the surname051015numberTraining material languagesTraining material languages: 4 number4Max. account search resultsMax. account search results: 13 number13Min. characters of surname insearchMin. characters of surname in search: 3 number3
Source: Feature cards: kiosk training and account search by RFID card

What does someone see when they scan a QR code that is not in the system?

For an unknown code, a cancelled badge or an invented string of characters, the system returns the same 404 response. As a result nobody can tell from the response which codes exist, and guessing reveals nothing. The answer for badge identification never returns the scanned code or token, only the identity to be confirmed.

Guessing is not a practical attack either: the badge token has 256 random bits from a random number generator, and the QR code encodes the instance address together with the token.

I lost my card or badge. What happens to my access?

Security cancels the QR badge in the panel, and the system issues a new one. The badge history stays, so it is known which code was valid on a given day. A new badge can be printed straight away from the security panel.

When a card is scanned, the gate uses a lookup with a cancellation filter, so a cancelled card does not pass as valid. Report the loss as soon as possible: until the carrier is blocked, someone could use it, unless access is also limited by missing trainings.

I have two accounts in the system. Will the gate report a missing training?

This happens when the same person was entered twice, for example once by HR and once by an external company. When the same person has two active accounts, the system moves the training result to the account with the card, so the gate stops reporting a missing training. It does not merge accounts by surname alone, because two different people can share a surname.

So the employee does not have to repeat a training just because a duplicate exists in the system. It is still worth reporting the duplicate to HR so that the administrator can tidy up the accounts.

Can I enter training when I have neither a card nor a phone with me?

If the site has set up an account for training on the employee number alone, a shared link or a printed QR code is enough. The tablet asks “Is it you?” and leads to the next required training. The site knowingly accepts the risk of impersonation here, because the employee number is not secret; the solution works where employees have no company e-mail or phone.

Training runs in kiosk mode: identification, material in the form of PDF slides or a video, and a multiple-choice test. The materials are available in four languages: Polish, English, Ukrainian and Russian.

Does InnerWeb supply cards and gate readers?

No. InnerWeb is a software producer and does not make or replace access control readers. We integrate with the access control (KD) system the site already has: the system receives card-tap events through a webhook and links them with trainings, qualifications, permits and time records.

Where the site wants to use a phone, a QR code is enough. Where it requires a card, the card stays in the KD system, and our software reads its result.

Checklist

Video

Frequently asked questions

Can a QR code from a phone replace a card?

Yes, if the site accepts this carrier. The scan records the entry and gives the same verdict as a card: valid trainings, qualifications, a permit and an active account.

Is the card number visible at the training station?

No. The search returns only active accounts with an active card and does not reveal the card number.

Can someone guess my QR code?

Practically no, because the token has 256 random bits. The answer for an unknown code is identical to the one for a cancelled code, so it is not possible to check which codes exist.

What should I do if the tablet shows someone else's name after a scan?

Answer no to the question “Is it you?”. The training is not credited, and you can scan your own code.

Let's check which carriers fit your gate

Book a call or a demo: we will show the card and QR badge scan, the gate verdict and kiosk training on sample data.

Let's talk