Starting point: the badge is made at the gate
A packaging plant that makes corrugated board receives several dozen guests a week: drivers, service technicians, customer auditors and supplier representatives. Before the print order was introduced, the badge was prepared when the guest was already standing at reception. The secretariat had to check who invited the guest and for which days, type in the data and only then hand over the badge.
For the plant this is not a spectacular problem, but it repeats every day. The queue at reception grows during shift changes, and the person at the desk does the same steps for each guest one by one. In addition, the plant requires a health declaration at entry (BRCGS standard), so reception already spends a few minutes on each guest.
- the guest appears at reception without a prepared badge,
- the secretariat does not know in advance how many guests will come that day,
- the host knows the guest, but the secretariat does not know the host or the purpose of the visit,
- printing depends on who happens to be at the desk.
Solution: one box in the invitation window
In the Invite a guest and Invite many guests windows there is a checkbox called Send the QR label print order. The host ticks it the same way as they choose the visit days. The box is visible only when the administrator has set the secretariat address; by default the address is empty, so the function is invisible until the plant deliberately turns it on.
When a single guest is invited, the secretariat gets the email immediately. The email says who was invited, for which days and by whom, and asks for the label to be prepared. A failed email does not block the invitation itself: the guest receives the invitation regardless of whether the secretariat mailbox responded.
Print button in the email
The email contains a Print button that opens the page for printing all labels from a given invitation. The page is available only after logging in with the administrator or security role, so forwarding the email does not reveal data to outsiders.
The print page does three things in one step: it issues a badge to the person who does not have one yet, records the fact of printing and prints every label on the label printer. The browser print window is a backup solution in case the workstation has no direct connection to the printer.
Secretariat work with 40 guests a week
What is on the label and why it is enough
The label has the plant logo in greyscale on the left, a QR code on the right, and the guest's first name, last name and company below it. The server name has been removed from the label because security does not need it to work. The QR code encodes an address with a random 64-character hexadecimal token, never a sequential number or a date, so it cannot be guessed or rebuilt from the data visible on the label.
Reprinting the same label does not change the token. The system records only who printed it last and when, which gives security a trail to check if a badge ends up in the wrong hands.
Effect: an example time calculation for the secretariat
The plant does not publish its own measurements, so below is an example calculation with explicit assumptions that each plant should replace with its own numbers. We assume that preparing a guest badge by hand at the desk takes the secretariat about 3 minutes, and printing a label from the prepared list takes about 20 seconds.
With 40 guests a week, this gives about 120 minutes of manual work compared with about 13 minutes of printing from the list. The difference is about 1 hour 52 minutes a week, or about 97 hours of secretariat work a year. More important than the number itself is the shift of work: the labels are ready before arrival, so the guest does not wait for printing.
Conclusions for a plant with a similar profile
The print order works where one person invites and another person issues the badge. This is a typical setup in production plants: the shift manager or purchasing department invites, and the secretariat or security handles entry. The solution does not require replacing access control or installing new readers: InnerWeb is a software producer, and the labels are printed on a label printer that the plant has bought and integrated.
For group invitations the secretariat does not get an email straight away, because at that stage the invitations know only email addresses, without QR codes. We describe this variant in a separate article about group invitations.
Secretariat time for guest badges
| Parameter | Value |
|---|---|
| Guests a week | 40 people |
| Manual badge preparation | 3 min per person |
| Printing a label from the list | 20 s per person |
Result: About 120 min versus 13 min a week; the difference is about 1 hour 52 minutes a week.
Note: Example calculation. Each plant replaces these assumptions with its own measurements.
Video
Frequently asked questions
Does the host need a special role to place a print order?
No, the ability to invite guests is enough. The print order field appears in the invitation windows if the administrator has set the secretariat address. Only the administrator or security can open the print page itself.
What happens if the email to the secretariat does not arrive?
The invitation still goes to the guest, because a failed print order does not block it. The secretariat can still print the label from the print page.
Does reprinting change the QR code?
No. Reprinting keeps the token, and the system records only who printed last and when. The code changes only when the badge is revoked.
Does the solution require new access control readers?
No. InnerWeb does not make readers or access cards. You need a label printer and a workstation with a browser.